US13, PAVING AND PEDESTRIAN IMPROVEMENTS - LLANGOLLEN BLVD TO BACON/BOULDEN BLVD
ID - T201901102
ID - T201901102
Location: DE NEW CASTLE County N2 District
Bid Date/Time: Jan. 14, 2025, 7 p.m.
Project Type:
Status:
Description:
US13, PAVING AND PEDESTRIAN IMPROVEMENTS - LLANGOLLEN BLVD TO BACON/BOULDEN BLVD US13, PAVING AND PEDESTRIAN IMPROVEMENTS - LLANGOLLEN BLVD TO BACON/BOULDEN BLVD - This project includes improvements to address multi-modal needs and pavement rehabilitation in this highly traveled section of US 13 between US40 and Boulden Blvd. The proposed improvements include ADA compliant sidewalks, improved crossings, median lighting, median barriers to discourage mid-block crossings and reduced lane widths along the road. Follow other incidental construction in accordance with the location, notes and details shown on the plans, and as directed by the Engineer.
US13, PAVING AND PEDESTRIAN IMPROVEMENTS - LLANGOLLEN BLVD TO BACON/BOULDEN BLVD US13, PAVING AND PEDESTRIAN IMPROVEMENTS - LLANGOLLEN BLVD TO BACON/BOULDEN BLVD - This project includes improvements to address multi-modal needs and pavement rehabilitation in this highly traveled section of US 13 between US40 and Boulden Blvd. The proposed improvements include ADA compliant sidewalks, improved crossings, median lighting, median barriers to discourage mid-block crossings and reduced lane widths along the road. Follow other incidental construction in accordance with the location, notes and details shown on the plans, and as directed by the Engineer.
Project Roles
Owners
- Owner DELAWARE DEPARTMENT OF TRANSPORTATION, DOVER DE 19903
Your local Trimble Construction Division dealer |
---|
SITECH Allegheny |
SITECH Northeast |