Recently Updated Bids
02-11-20
FL BROWARD MIAMI-DADE PALM BEACH TURNPIKE County D8 District - providing all labor, materials, equipment, and incidentals necessary to control weeds and grass by chemical vegetation control associated with off-road assets such as fence-lines, sound-walls, drainag (E8S36-R0)
- Bid Date:
- February 11, 2020
- Project Type(s)
- Description
- LETTING LOCATION: TPK HDQTRS, OCOEE, FLORIDA 34761, POSTING DATES: 02/25/2020 and 03/10/2020 CONTRACT DAYS: 365 CONTRACT EXECUTION DAYS: 10 SPECIAL START DATE: N/A ACQUIS./FLEXIBLE START TIME: 14 The work specified in this contract consists of providing all labor, materials, equipment, and incidentals necessary to control weeds and grass by chemical vegetation control associated with off-road assets such as fence-lines, sound-walls, drainage structures and aquatic areas, at various locations on Homestead Extension of Florida's Turnpike (SR 821), Milepost (MP) 0.0 to 46.5; Florida's Turnpike (SR 91), MP 0.0X to 100.0, and Sawgrass Expressway (SR 869), MP 0.0 to 22.5. Prior to …
- Plans:
FL BROWARD MIAMI-DADE PALM BEACH TURNPIKE County D8 District - providing all labor, materials, equipment, and incidentals necessary to control weeds and grass by chemical vegetation control associated with roadway and bridge structures at various locations on Hom (E8S37-R0)
- Bid Date:
- February 11, 2020
- Project Type(s)
- Description
- LETTING LOCATION: TPK HDQTRS POSTING DATES: 02/25/2020 and 03/10/2020 CONTRACT DAYS: 365 CONTRACT EXECUTION DAYS: 10 SPECIAL START DATE: N/A ACQUIS./FLEXIBLE START TIME: 14 The work specified in this contract consists of providing all labor, materials, equipment, and incidentals necessary to control weeds and grass by chemical vegetation control associated with roadway and bridge structures at various locations on Homestead Extension of Florida's Turnpike (SR 821), Milepost (MP) 0.0 to 46.5; Florida's Turnpike (SR 91), MP 0.0X to 100.0, and Sawgrass Expressway (SR 869), MP 0.0 to 22.5. Prior to beginning work under this Contract, the Contractor shall submit to …
- Plans:
FL TURNPIKE County D8 District - providing all labor, materials, equipment, and incidentals necessary to furnish, install, maintain, and remove traffic control devices for the temporary lane closure of lane(s) at various service plaz (E8S38-R0)
- Bid Date:
- February 11, 2020
- Project Type(s)
- Description
- LETTING LOCATION: TPK HDQTRS, OCOEE, FLORIDA 34761, POSTING DATES: 02/25/2020 and 03/10/2020 CONTRACT DAYS: 365 CONTRACT EXECUTION DAYS: 10 SPECIAL START DATE: N/A ACQUIS./FLEXIBLE START TIME: 14 The work specified in this contract consists of providing all labor, materials, equipment, and incidentals necessary to furnish, install, maintain, and remove traffic control devices for the temporary lane closure of lane(s) at various service plazas, toll plaza locations and all other Turnpike locations statewide. Prior to beginning work under this Contract, the Contractor shall submit to the Engineer for approval, two copies of the Contractor's proposed plan and methods for performing the …
- Plans:
02-20-20
FL CLAY County D2 District - 2 additional northbound lanes (E2Z53)
- Bid Date:
- February 20, 2020
- Project Type(s)
- Description
- LETTING LOCATION: 1109 S. Marion Ave, Lake City, FL 32025, POSTING DATES: 03/30/2020 and 04/06/2020 CONTRACT DAYS: 830 CONTRACT EXECUTION DAYS: 10 SPECIAL START DATE: N/A ACQUIS./FLEXIBLE START TIME: 15 Days (Acq. time) The Florida Department of Transportation will be constructing a concrete test road.The test road will investigate the latest innovations in concrete pavement design, construction, materials and instrumentation. It is critical that the contractor selected for the construction of the experimental pavement sections be very experienced in constructing concrete pavements and understand the complexity of building an experimental test facility. Data from this project will guide the Department …
- Plans:
03-03-20
FL BREVARD County D5 District - replacement of fender timber components with composite lumber, replacement of associated hardware and wire ropes, and salvaging and re-installation of navigation lights with associated temporary light (E50A9)
- Bid Date:
- March 3, 2020
- Project Type(s)
- Description
- LETTING LOCATION: 719 S Woodland Blvd POSTING DATES: 03/17/2020 and 03/24/2020 CONTRACT DAYS: 180 CONTRACT EXECUTION DAYS: 10 SPECIAL START DATE: N/A ACQUIS./FLEXIBLE START TIME: 30 The Improvements under this Contract consist of replacement of fender timber components with composite lumber, replacement of associated hardware and wire ropes, and salvaging and re-installation of navigation lights with associated temporary lighting and electrical work at SR 404 over Indian River (Bridge Nos. 700077 and 700143) and SR 404 over Banana River (Bridge Nos. 700081 and 700147) in Brevard County. PREQUALIFICATION REQUIRED
- Plans:
| Your local Wirtgen America dealer |
|---|
| Dobbs Equipment (DXC) |
FL BREVARD ORANGE VOLUSIA DIST/ST-WIDE County D5 District - desilting, video, and repair of drainage facilities on various roadways in Brevard, Volusia, and Orange counties (E5V76)
- Bid Date:
- March 3, 2020
- Project Type(s)
- Description
- LETTING LOCATION: 719 S Woodland Blvd POSTING DATES: 03/17/2020 and 03/24/2020 CONTRACT DAYS: 365 CONTRACT EXECUTION DAYS: 10 SPECIAL START DATE: N/A ACQUIS./FLEXIBLE START TIME: N/A FDOT District 5 Proposal ID No: E5V76 Financial Project No: 444001-1-72-01 Fiscal Year: 2020 Counties: Brevard, Volusia, and Orange Calendar Days: 365 This is a Maintenance Work Document driven Contract with a Budgetary Ceiling of $300,000.00. Intent: The work under this contract consists of desilting, video, and repair of drainage facilities on various roadways in Brevard, Volusia, and Orange counties. Experience: For this Contract the Contractor is required to have at least three (3) …
- Plans:
FL MARION County D5 District - bridge deck overlay repairs (E53A0)
- Bid Date:
- March 3, 2020
- Project Type(s)
- Description
- LETTING LOCATION: 719 S Woodland Blvd POSTING DATES: 03/17/2020 and 03/24/2020 CONTRACT DAYS: 180 CONTRACT EXECUTION DAYS: 10 SPECIAL START DATE: N/A ACQUIS./FLEXIBLE START TIME: 30 The Improvements under this Contract consist of bridge deck overlay repairs. Located in Marion County, Florida (36030) Bridge Nos. 360025 & 360026 carrying SR 25 (US 441) over CSX Railroads from MP 0.824 to 0.881 and 1.561 to 1.614. PREQUALIFICATION REQUIRED
- Plans:
FL ORANGE County D5 District - bridge deck epoxy overlay and joint installation at SR 50 over St (E50A6)
- Bid Date:
- March 3, 2020
- Project Type(s)
- Description
- LETTING LOCATION: 719 S Woodland Blvd POSTING DATES: 03/17/2020 and 03/24/2020 CONTRACT DAYS: 100 CONTRACT EXECUTION DAYS: 10 SPECIAL START DATE: N/A ACQUIS./FLEXIBLE START TIME: 30 The Improvements under this Contract consist of bridge deck epoxy overlay and joint installation at SR 50 over St. Johns River (Bridge Nos. 750016 and 750171) in Orange County. PREQUALIFICATION REQUIRED
- Plans:
FL ORANGE SEMINOLE DIST/ST-WIDE County D5 District - FDOT District 5 Financial Project No (E5V06)
- Bid Date:
- March 3, 2020
- Project Type(s)
- Description
- LETTING LOCATION: 719 S Woodland Blvd POSTING DATES: 03/17/2020 and 03/24/2020 CONTRACT DAYS: 150 CONTRACT EXECUTION DAYS: 10 SPECIAL START DATE: N/A ACQUIS./FLEXIBLE START TIME: 14 FDOT District 5 Financial Project No.: 444100-1-72-01 Fiscal Year: 2020 Counties: Orange, Seminole Contract Calendar Days: 150 Lead Time: 14 Days This is a Maintenance Pay Item Contract. Intent: The work under this Contract includes removal and installation of pavement markings and RPMs on various sections of roadway throughout Orange & Seminole Counties. Experience: For this Contract the Contractor is required to have at least three (3) years of experience in the performance of …
- Plans:
03-25-20
FL ALACHUA County CT District - milling and resurfacing, base work, shoulder treatment, drainage improvements, curb and gutters, traffic signals, lighting, highway signing, sidewalks, fence, and other incidental construction on SR 2 (T2765)
- Bid Date:
- March 25, 2020
- Project Type(s)
- Description
- LETTING LOCATION: Contracts Administration Office POSTING DATES: 04/08/2020 and 04/22/2020 CONTRACT DAYS: 180 CONTRACT EXECUTION DAYS: 10 SPECIAL START DATE: N/A ACQUIS./FLEXIBLE START TIME: 15 Days The improvements under this contract consist of milling and resurfacing, base work, shoulder treatment, drainage improvements, curb and gutters, traffic signals, lighting, highway signing, sidewalks, fence, and other incidental construction on SR 24 (SW Archer Road) in Alachua County from SR 45 to east of SW 81st Street.
- Plans:
| Your local Trimble Construction Division dealer |
|---|
| SITECH South |
| SITECH Mid-South |
| SITECH Tri-Rivers |
Loading...