providing all labor, materials, equipment and incidentals necessary for construction of SR 589 (Suncoast Parkway 2) from CR 495 to US 19 in Citrus County (02470), from milepost 75
ID - E8W33
ID - E8W33
Location: FL CITRUS County D8 District
Bid Date/Time: Jan. 14, 2026, 12:30 a.m.
Project Type:
Status: Active
Description:
LETTING LOCATION: TPK HDQ POSTING DATES: 02/17/2026 and 03/03/2026 CONTRACT DAYS: 1759 CONTRACT EXECUTION DAYS: 10 SPECIAL START DATE: N/A ACQUIS./FLEXIBLE START TIME: 90 Work consists of providing all labor, materials, equipment and incidentals necessary for construction of SR 589 (Suncoast Parkway 2) from CR 495 to US 19 in Citrus County (02470), from milepost 75.707 to milepost 80.720. Other components of the project include roadway, drainage, signing and pavement markings, lighting, signalization, ITS bridge structures, and toll facilities. No Pre-Bid Conference. Contractor must be prequalified. For projects in excess of $50 million, in addition to meeting all other qualification requirements of Section 337.14, Florida Statutes, and Rule Chapter 14-22, Florida Administrative Code, any Contractor who is not prequalified and in good standing with the Department as of January 1, 2019, must submit evidence which demonstrates satisfactory completion of at least two projects, each in excess of $15 million, for the Florida Department of Transportation or for any other state department of transportation. Acceptability of the evidence related to the two projects is at the sole discretion of the Department
LETTING LOCATION: TPK HDQ POSTING DATES: 02/17/2026 and 03/03/2026 CONTRACT DAYS: 1759 CONTRACT EXECUTION DAYS: 10 SPECIAL START DATE: N/A ACQUIS./FLEXIBLE START TIME: 90 Work consists of providing all labor, materials, equipment and incidentals necessary for construction of SR 589 (Suncoast Parkway 2) from CR 495 to US 19 in Citrus County (02470), from milepost 75.707 to milepost 80.720. Other components of the project include roadway, drainage, signing and pavement markings, lighting, signalization, ITS bridge structures, and toll facilities. No Pre-Bid Conference. Contractor must be prequalified. For projects in excess of $50 million, in addition to meeting all other qualification requirements of Section 337.14, Florida Statutes, and Rule Chapter 14-22, Florida Administrative Code, any Contractor who is not prequalified and in good standing with the Department as of January 1, 2019, must submit evidence which demonstrates satisfactory completion of at least two projects, each in excess of $15 million, for the Florida Department of Transportation or for any other state department of transportation. Acceptability of the evidence related to the two projects is at the sole discretion of the Department
Project Roles
Owners
- Owner FLORIDA DEPARTMENT OF TRANSPORTATION, 605 SUWANNEE STREET TALLAHASSEE FL 32301