LAKE Highway Number Maintenance Other
ID - E54D0-R0
ID - E54D0-R0
Location: FL LAKE County 05 District
Bid Date/Time: Dec. 3, 2025, midnight
Project Type:
Status: active
Description:
LETTING LOCATION: 719 S. Woodland Blvd POSTING DATES: 12/16/2025 and 12/23/2025 CONTRACT DAYS: 365 CONTRACT EXECUTION DAYS: 10 SPECIAL START DATE: N/A ACQUIS./FLEXIBLE START TIME: N/A FDOT District 5 Proposal ID No.: E54D0 Financial Project No.: 429142-1-72-22 Fiscal Year: 2026 County: Flagler, Lake, Seminole, and Volusia Calender Days: 365 This is a Maintenance Work Document Driven Contract with a budget estimate of $600,000.00. The Contract will be awarded at the budget estimate amount. This Contract includes an option for renewal(s). Intent The work under this Contract consists of asphalt pavement milling and resurfacing; handrail, guardrail, crash cushion (attenuator) repair; concrete slab repair, pipe desilt & video; and pavement markings replacement on Department maintained roadways on an as-need basis in Lake, Seminole, Volusia and Flagler Counties. For this Contract the Contractor is required to have at least three (3) years of experience in the performance of asphalt paving projects, or the Project Superintendent must have at least three (3) years of like experience as a Superintendent. A Contractor that presently has a certificate of prequalification with the Department in "Hot Plant Mix Bituminous Course" will suffice to meet the above requirements. Note: The quantities shown on the Bid Price Proposal are approximate and only represent estimated planned requirements based on historical or specific project needs. The Department does not guarantee any maximum or minimum quantity, any range of quantities, or the exact quantities shown for each bid item. The Departments estimated quantities and the Contractors bid price will be used to calculate a total bid amount. This total bid amount will then be used to determine the low bidder; however, actual payment under the awarded contract will be based on actual quantities completed. For this Contract in which specific sites are not identified at the time of letting, the Engineer will issue a Work Document. Work Documents will identify the location, description, amount of work to be accomplished, and the number of calendar days to complete the work.
LETTING LOCATION: 719 S. Woodland Blvd POSTING DATES: 12/16/2025 and 12/23/2025 CONTRACT DAYS: 365 CONTRACT EXECUTION DAYS: 10 SPECIAL START DATE: N/A ACQUIS./FLEXIBLE START TIME: N/A FDOT District 5 Proposal ID No.: E54D0 Financial Project No.: 429142-1-72-22 Fiscal Year: 2026 County: Flagler, Lake, Seminole, and Volusia Calender Days: 365 This is a Maintenance Work Document Driven Contract with a budget estimate of $600,000.00. The Contract will be awarded at the budget estimate amount. This Contract includes an option for renewal(s). Intent The work under this Contract consists of asphalt pavement milling and resurfacing; handrail, guardrail, crash cushion (attenuator) repair; concrete slab repair, pipe desilt & video; and pavement markings replacement on Department maintained roadways on an as-need basis in Lake, Seminole, Volusia and Flagler Counties. For this Contract the Contractor is required to have at least three (3) years of experience in the performance of asphalt paving projects, or the Project Superintendent must have at least three (3) years of like experience as a Superintendent. A Contractor that presently has a certificate of prequalification with the Department in "Hot Plant Mix Bituminous Course" will suffice to meet the above requirements. Note: The quantities shown on the Bid Price Proposal are approximate and only represent estimated planned requirements based on historical or specific project needs. The Department does not guarantee any maximum or minimum quantity, any range of quantities, or the exact quantities shown for each bid item. The Departments estimated quantities and the Contractors bid price will be used to calculate a total bid amount. This total bid amount will then be used to determine the low bidder; however, actual payment under the awarded contract will be based on actual quantities completed. For this Contract in which specific sites are not identified at the time of letting, the Engineer will issue a Work Document. Work Documents will identify the location, description, amount of work to be accomplished, and the number of calendar days to complete the work.
Project Roles
| Your local Topcon Positioning Systems Inc dealer |
|---|
| Linder Industrial Machinery |