PAVEMENT PRESERVATION (MICRO-MILL, RESURFACE, AND STRIPE)
ID - 20250829012
ID - 20250829012
Location: AL MONTGOMERY County 0603 District
Bid Date/Time: Aug. 29, 2025, 3 p.m.
Project Type:
Status:
Description:
PAVEMENT PRESERVATION (MICRO-MILL, RESURFACE, AND STRIPE) for constructing the Pavement Preservation (Micro-Fine Milling, Resurfacing, and Traffic Stripe) on I-85 from a point near the Ann Street Interchange (MP 3.377) to a point near the SR-8 (US-80) Interchange (MP 6.331) in Montgomery. Length 2.954 mi.
PAVEMENT PRESERVATION (MICRO-MILL, RESURFACE, AND STRIPE) for constructing the Pavement Preservation (Micro-Fine Milling, Resurfacing, and Traffic Stripe) on I-85 from a point near the Ann Street Interchange (MP 3.377) to a point near the SR-8 (US-80) Interchange (MP 6.331) in Montgomery. Length 2.954 mi.
Project Roles
Owners
- Owner ALABAMA DEPARTMENT OF TRANSPORTATION, 1409 MADISON AVENUE MONTGOMERY AL 36104
Your local Trimble Construction Division dealer |
---|
SITECH Mid-South |
SITECH South |
SITECH Tri-Rivers |