Recently Updated Bids
04-03-26
MI Berrien County County - Roadside Facilities - Berrien County (11000-215942)
- Bid Date:
- April 3, 2026
- Project Type(s)
- Description
- 4.28 mi of hot mix asphalt shared-use path, concrete curb, gutter and sidewalk ramps, signal and pavement markings on Red Arrow Highway from north of Willard Avenue to south of Johnson Road, Berrien County. This is a Local Agency project. ** 6271 Cb or Comb/Jt. 6271 Ea, N9-6L **In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb, Ea and N9-6L. If the prime contractor is not prequalified in those subclassifications, it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder.
- Plans:
MI Gladwin County County - Bridge rehabilitation with saline treatment, bridge railing retrofit, approach work and pavemnt markings on Ritchie Road over the Sugar River, and Chappel Dam Road over the Cedar River, and Eagleson R (26000-220491)
- Bid Date:
- April 3, 2026
- Project Type(s)
- Description
- Bridge rehabilitation with saline treatment, bridge railing retrofit, approach work and pavemnt markings on Ritchie Road over the Sugar River, and Chappel Dam Road over the Cedar River, and Eagleson Road over Cedar River, Gladwin County. This is a Local Agency project. ** 512 Fa **In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of N9-6L. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder.
- Plans:
MI Kent County County - Resurfacing - Kent County (41000-216061)
- Bid Date:
- April 3, 2026
- Project Type(s)
MI Ontonagon County County - Roadside Facilities - Ontonagon County (66000-213711)
- Bid Date:
- April 3, 2026
- Project Type(s)
MI Sanilac County County - Bridge reconstruction including replacement with 18-inch by 50-inch steel plate girder and approach work on Marlette Road over the south branch of the Cass River, Sanilac County (74000-220522)
- Bid Date:
- April 3, 2026
- Project Type(s)
- Description
- Bridge reconstruction including replacement with 18-inch by 50-inch steel plate girder and approach work on Marlette Road over the south branch of the Cass River, Sanilac County. This is a Local Agency project. **2753 Fa **In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of Ea. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder.
- Plans:
| Your local Trimble Construction Division dealer |
|---|
| SITECH Michigan |
MI Washtenaw County County - Bridge rehabilitation including polyurethane culvert crack repair, chemical grouting and jet filters on US-23 over Buck Creek Drain, Washtenaw County (81076-223459)
- Bid Date:
- April 3, 2026
- Project Type(s)
- Description
- Bridge rehabilitation including polyurethane culvert crack repair, chemical grouting and jet filters on US-23 over Buck Creek Drain, Washtenaw County. ** Prequalification Waived **Electronic bidding is required for prequalification waived projects. Please visit www.michigan.gov/mdotcontractors for information regarding electronic bidding.
- Plans:
MI Wexford County County - Bridge reconstruction converting into snowmobile trail including replacement with concrete panel deck, abutment rehabilitation, construct steel helper bent and approach work on Betsie Valley Trail ove (83000-213626)
- Bid Date:
- April 3, 2026
- Project Type(s)
- Description
- Bridge reconstruction converting into snowmobile trail including replacement with concrete panel deck, abutment rehabilitation, construct steel helper bent and approach work on Betsie Valley Trail over the Manistee River, Wexford County. This project includes a 2 year bridge coating warranty. This is a Michigan Department of Natural Resources project. ** 1294 Fa **In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Ea and N9-1A. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed …
- Plans: