Converting roadway to a shared use path includes adding traffic circles, delineators, signing and pavement markings.
ID - 81000-219147
ID - 81000-219147
Location: MI Washtenaw County County 06006 District
Bid Date/Time: Aug. 7, 2026, 10:30 a.m.
Project Type:
Status: Advertised
Description:
Converting roadway to a shared use path includes adding traffic circles, delineators, signing and pavement markings. Converting roadway to a shared-use path including adding traffic circles, delineators, signing and pavement markings on Washington Street from 1st Street to 3rd Street in the city of Ann Arbor, Washtenaw County. This is a Local Agency project. ** 249 N3 or 249 N6 **In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of N3 and N6. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder.
Converting roadway to a shared use path includes adding traffic circles, delineators, signing and pavement markings. Converting roadway to a shared-use path including adding traffic circles, delineators, signing and pavement markings on Washington Street from 1st Street to 3rd Street in the city of Ann Arbor, Washtenaw County. This is a Local Agency project. ** 249 N3 or 249 N6 **In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of N3 and N6. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder.
Project Roles
Owners
- Owner MICHIGAN DEPARTMENT OF TRANSPORTATION, 400 TRANSPORTATION LN LANSING MI 48822
| Your local Trimble Construction Division dealer |
|---|
| SITECH Michigan |
| SITECH Michigan |
| SITECH Michigan |
| SITECH Michigan |