US 49W From 5-lane Sec S of Indianola To N of US82 Begin 2-l
ID - CSP0072040291
ID - CSP0072040291
Location: MS SUNFLOWER (67) County 3 District
Bid Date/Time: May 24, 2022, 10 a.m.
Project Type:
Asphalt
Status: Awarded
Description:
US 49W From 5-lane Sec S of Indianola To N of US82 Begin 2-l Mill & Overlay approximately 1 mile of US 49W from the 5-Lane Section south of Indianola to north of US 82 at the Beginning of the 2-Lane Section, known as State Project No. SP-0072-04(029) / 108934301 in Sunflower County.
US 49W From 5-lane Sec S of Indianola To N of US82 Begin 2-l Mill & Overlay approximately 1 mile of US 49W from the 5-Lane Section south of Indianola to north of US 82 at the Beginning of the 2-Lane Section, known as State Project No. SP-0072-04(029) / 108934301 in Sunflower County.
Project Roles
Owners
- Owner MISSISSIPPI DEPARTMENT OF TRANSPORTATION, 4045 HIGHWAY 49 N JACKSON MS 39216
Bidders
- Bidder State Estimate, - $2,067,425, PO Box 1850 Jackson MS 39215
- Bidder APAC - MISSISSIPPI, INC., - $2,205,376, PO Box 24508 Jackson MS 39225
Apparent Low Bidder: State Estimate
| Your local Takeuchi Mfg Ltd dealer |
|---|
| Kirby-Smith Machinery |
| Star Equipment LTD |