SUM-IR 77-15.87
ID - SUM88937
ID - SUM88937
Location: OH SUMMIT County 04 District
Bid Date/Time: March 10, 2022, 10 a.m.
Project Type:
Asphalt
Status: Awarded
Description:
SUM-IR 77-15.87 FOR IMPROVING VARIOUS SECTIONS IN THE CITY OF AKRON, WITHIN SUMMIT COUNTY, OHIO, IN ACCORDANCE WITH PLANS AND SPECIFICATIONS BY RESURFACING AND PERFORMING SOME PARTIAL DEPTH ASPHALT CONCRETE REPAIRS AND FULL DEPTH ASPHALT AND CONCRETE BASE REPAIRS USING RRCM CONCRETE ALONG A 3.64 MILES PORTION OF I-77 FROM THE STATE ROUTE 262 INTERCHANGE TO THE PAVEMENT BREAK JUST PAST THE SCHOCALOG ROAD OVERPASS, INCLUDING ALL RELATED ITEMS OF WORK. PROJECT INCLUDES RESURFACING THE RAMPS AT THE STATE ROUTE 162/I-77 AND THE WHITE POND RD/I-77 INTERCHANGES AND ALSO INCLUDES MINOR STRUCTURE WORK AT SEVERAL STRUCTURES ALONG THE RESURFACING AREA.
SUM-IR 77-15.87 FOR IMPROVING VARIOUS SECTIONS IN THE CITY OF AKRON, WITHIN SUMMIT COUNTY, OHIO, IN ACCORDANCE WITH PLANS AND SPECIFICATIONS BY RESURFACING AND PERFORMING SOME PARTIAL DEPTH ASPHALT CONCRETE REPAIRS AND FULL DEPTH ASPHALT AND CONCRETE BASE REPAIRS USING RRCM CONCRETE ALONG A 3.64 MILES PORTION OF I-77 FROM THE STATE ROUTE 262 INTERCHANGE TO THE PAVEMENT BREAK JUST PAST THE SCHOCALOG ROAD OVERPASS, INCLUDING ALL RELATED ITEMS OF WORK. PROJECT INCLUDES RESURFACING THE RAMPS AT THE STATE ROUTE 162/I-77 AND THE WHITE POND RD/I-77 INTERCHANGES AND ALSO INCLUDES MINOR STRUCTURE WORK AT SEVERAL STRUCTURES ALONG THE RESURFACING AREA.
Project Roles
Owners
- Owner OHIO DEPARTMENT OF TRANSPORTATION, 125 SOUTH FRONT STREET COLUMBUS OH 43215
Bidders
- Bidder SHELLY & SANDS INC, - $5,133,168, 1515 HARMON AVE COLUMBUS OH 43223
- Bidder SHELLY, - $7,018,761, 80 PARK DRIVE THORNVILLE OH 43076
- Bidder KOKOSING CONSTRUCTION COMPANY, INC., - $6,138,157, 6235 WESTERVILLE ROAD WESTERVILLE OH 43081
Apparent Low Bidder: SHELLY & SANDS INC
| Your local Topcon Positioning Systems Inc dealer |
|---|
| Star Equipment LTD |