Deep overlay, railing replacement, steel repair, substructure repair, approach work and hot mix asphalt resurfacing.
ID - 41131-201255-2
ID - 41131-201255-2
Location: MI Kent County County 03009 District
Bid Date/Time: Jan. 7, 2022, 10:30 a.m.
Project Type:
Asphalt
Status: Awarded
Description:
Deep overlay, railing replacement, steel repair, substructure repair, approach work and hot mix asphalt resurfacing. 4.50 mi of hot mix asphalt cold milling and resurfacing and bridge rehabilitation including concrete deep overlay, expansion joint and railing replacement, steel repair, substructure repair, approach work and pavement markings on I-96 from east of Bristol Avenue to West River Drive and I-96 connector to US-131/I-296 southbound over Marquette Rail and West River Drive in the city of Walker, Kent County. This project includes a 3 year materials and workmanship pavement warranty and two 5 year materials and workmanship pavement warranties. ** 5078 Cb or 5078 Fa **In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb and Fa. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder.
Deep overlay, railing replacement, steel repair, substructure repair, approach work and hot mix asphalt resurfacing. 4.50 mi of hot mix asphalt cold milling and resurfacing and bridge rehabilitation including concrete deep overlay, expansion joint and railing replacement, steel repair, substructure repair, approach work and pavement markings on I-96 from east of Bristol Avenue to West River Drive and I-96 connector to US-131/I-296 southbound over Marquette Rail and West River Drive in the city of Walker, Kent County. This project includes a 3 year materials and workmanship pavement warranty and two 5 year materials and workmanship pavement warranties. ** 5078 Cb or 5078 Fa **In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb and Fa. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder.
Project Roles
Owners
- Owner MICHIGAN DEPARTMENT OF TRANSPORTATION, 400 TRANSPORTATION LN LANSING MI 48822
Bidders
- Bidder RIETH-RILEY CONSTRUCTION CO., INC., - $6,087,289, PO Box 477 Goshen IN 46527
- Bidder MICHIGAN PAVING AND MATERIALS COMPANY, - $6,070,393, 2575 S Haggerty Rd Ste 100 Canton MI 48188
Apparent Low Bidder: MICHIGAN PAVING AND MATERIALS COMPANY
| Your local Iowa Mold Tooling Co Inc dealer |
|---|
| Star Equipment LTD |