HWY. 70 ? 65TH ST. (FRONTAGE RD.) (SEL. SECS.) (S)
ID - 061646
ID - 061646
Location: AR PULASKI|SALINE County 06 District
Bid Date/Time: Aug. 16, 2023, 10 a.m.
Project Type:
Asphalt
Status: Awarded
Description:
HWY. 70 ? 65TH ST. (FRONTAGE RD.) (SEL. SECS.) (S) THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 42.297 MILES OF INTERSTATE 30 FRONTAGE ROADS AND RAMPS, HYDRODEMOLITION ON TWO STRUCTURES, AND POLYMER OVERLAY ON FOUR STRUCTURES IN PULASKI AND SALINE COUNTIES. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL OF GUARDRAIL, STONE BACKFILL, ACHM SURFACE COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, GUARDRAIL, PAVEMENT MARKING, AND MISC. ITEMS.
HWY. 70 ? 65TH ST. (FRONTAGE RD.) (SEL. SECS.) (S) THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 42.297 MILES OF INTERSTATE 30 FRONTAGE ROADS AND RAMPS, HYDRODEMOLITION ON TWO STRUCTURES, AND POLYMER OVERLAY ON FOUR STRUCTURES IN PULASKI AND SALINE COUNTIES. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL OF GUARDRAIL, STONE BACKFILL, ACHM SURFACE COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, GUARDRAIL, PAVEMENT MARKING, AND MISC. ITEMS.
Project Roles
Owners
- Owner ARKANSAS DEPARTMENT OF TRANSPORTATION, 1001 NORTH UNIVERSITY AVENUE LITTLE ROCK AR 72207
Bidders
- Bidder CRANFORD CONSTRUCTION CO., - $32,775,044, P.O. BOX 7008 PINE BLUFF, AR 71611
- Bidder REDSTONE CONST GROUP INC, - $48,647,096, 505 WEST DIXON ROAD LITTLE ROCK AR 72206
Apparent Low Bidder: CRANFORD CONSTRUCTION CO.
| Your local Topcon Positioning Systems Inc dealer |
|---|
| Star Equipment LTD |