CRAWFORD CO. LINE ? HWY. 62 (SEL. SECS.) (S)
ID - 040883
ID - 040883
Location: AR WASHINGTON County 04 District
Bid Date/Time: Nov. 1, 2023, 1:30 p.m.
Project Type:
Asphalt
Status: Awarded
Description:
CRAWFORD CO. LINE ? HWY. 62 (SEL. SECS.) (S) THE PURPOSE OF THIS PROJECT IS TO OVERLAY WITH ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 18.840 MILES AND POLYMER OVERLAY 20 BRIDGES ON INTERSTATE 49 IN WASHINGTON COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ACHM SURFACE COURSE, ULTRATHIN BONDED WEARING COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, SCARIFYING CONCRETE PAVEMENT, MAINTENANCE OF TRAFFIC, UNDERDRAIN INSPECTION AND FLUSHING, RUMBLE STRIPS, SPALL REPAIR OF PORTLAND CEMENT CONCRETE, REPAIR OF PARAPET RAIL, AND MISC. ITEMS.
CRAWFORD CO. LINE ? HWY. 62 (SEL. SECS.) (S) THE PURPOSE OF THIS PROJECT IS TO OVERLAY WITH ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 18.840 MILES AND POLYMER OVERLAY 20 BRIDGES ON INTERSTATE 49 IN WASHINGTON COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ACHM SURFACE COURSE, ULTRATHIN BONDED WEARING COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, SCARIFYING CONCRETE PAVEMENT, MAINTENANCE OF TRAFFIC, UNDERDRAIN INSPECTION AND FLUSHING, RUMBLE STRIPS, SPALL REPAIR OF PORTLAND CEMENT CONCRETE, REPAIR OF PARAPET RAIL, AND MISC. ITEMS.
Project Roles
Owners
- Owner ARKANSAS DEPARTMENT OF TRANSPORTATION, 1001 NORTH UNIVERSITY AVENUE LITTLE ROCK AR 72207
Bidders
- Bidder APAC-CENTRAL, INC., - $55,089,923, P.O. BOX 9208 FAYETTEVILLE, AR 72704
- Bidder EMERY SAPP & SONS, INC., - $49,450,895, 2301 I-70 DRIVE NW COLUMBIA MO 65202
Apparent Low Bidder: EMERY SAPP & SONS, INC.