J9P3772, J9S3810 - ROUTE 25, 61 - CAPE GIRARDEAU COUNTY
ID - 260116-H02
ID - 260116-H02
Location: MO CAPE GIRARDEAU County SE District
Bid Date/Time: Jan. 16, 2026, 5 p.m.
Project Type:
Status: Active
Description:
J9P3772, J9S3810 - ROUTE 25, 61 - CAPE GIRARDEAU COUNTY ****(1): Job J9P3772 Route 25 CAPE GIRARDEAU County. Bridge replacement over Drainage Ditch Number 25 near Advance, the total length of improvement being 0.09 miles.****(2): Job J9S3810 Route 61 CAPE GIRARDEAU County. Bridge replacement over Erlide Creek near Advance, the total length of improvement being 0.063 miles.
J9P3772, J9S3810 - ROUTE 25, 61 - CAPE GIRARDEAU COUNTY ****(1): Job J9P3772 Route 25 CAPE GIRARDEAU County. Bridge replacement over Drainage Ditch Number 25 near Advance, the total length of improvement being 0.09 miles.****(2): Job J9S3810 Route 61 CAPE GIRARDEAU County. Bridge replacement over Erlide Creek near Advance, the total length of improvement being 0.063 miles.
Project Roles
| Your local Link Belt dealer |
|---|
| Kirby-Smith Machinery |