Current Bids
07-03-25
CO EAGLE County - EAGLE Highway Number None ROUTINE MAINTENANCE (C26426)
- Bid Date:
- July 3, 2025
- Project Type(s)
- Description
- I-70 MP 130 TO 168, REGION 3 This project will consist of removal and replacement of highway signs, posts, and bases on Interstate 70 (I-70) from mile marker (MM) 130.5 to MM 168.0 as shown in the project plans or as directed by the project engineer. Project Engineer: Bill Crawford cell: 970 250-5077 william.crawford@state.co.us Pre-Bid meeting on May 28, 2025 at 1:00 PM, contact Bill Crawford at william.crawford@state.co.us to be added to the virtual meeting.
- Plans:
07-11-25
AZ Apache County - Apache Highway Number None None (2024061)
- Bid Date:
- July 11, 2025
- Project Type(s)
- Description
- The proposed project is located in Apache County at the intersections of CR 5020 & US 180A in Concho and CR 2108 & US 191 in Nutrioso. The work consists of installing advance-warning signs with solar flashers, oversized stop signs with reflective tape and reflectors, transverse rumble strips, and a Stop-Ahead sign with solar flashers and other related work.
- Plans:
AZ Maricopa County - Maricopa Highway Number None None (2024087)
- Bid Date:
- July 11, 2025
- Project Type(s)
- Description
- The proposed project is located within Maricopa County and is on US Route 60 (US 60). This planned project is located within the Arizona Dept. of Transportation Northwest District and Central District and will repair existing pavement distresses between Wickenburg, AZ (MP 110.59) and Morristown AZ (MP 121.50). Proposed work consists of milling and replacing AC pavement, installing pavement markings and other related work.
- Plans:
AZ Maricopa County - Maricopa Highway Number None None (2025045)
- Bid Date:
- July 11, 2025
- Project Type(s)
AZ Mohave County - Mohave Highway Number None None (2025006)
- Bid Date:
- July 11, 2025
- Project Type(s)
- Description
- The proposed project is on Pierce Ferry Road, located in the City of Dolan Springs in Mohave County The project limits are approximately 5.7 miles between US 93 and Lloyd Street. The work includes centerline and edge line rumble strip installation with fog coat. The work also includes centerline and edge line pavement marking and other related work.
- Plans:
Your local Volvo Construction Equipment dealer |
---|
Faris Machinery |
AZ Santa Cruz County - Santa Cruz Highway Number None None (2025015)
- Bid Date:
- July 11, 2025
- Project Type(s)
- Description
- The proposed work is located in Santa Cruz County on SR 289 between mileposts 0.00 and 10.83, near Rio Rico. The work includes removing the existing asphaltic concrete surface course and replacing it with new asphaltic concrete followed by hot applied chip seal coat overlay. The work also includes replacing guardrails and guardrail end terminals, constructing pipe flared end sections, constructing ford wall, replacing pavement markings, and other related work.
- Plans:
AZ Yuma County - Yuma Highway Number None None (2024049)
- Bid Date:
- July 11, 2025
- Project Type(s)
- Description
- The proposed project is located in the Yuma County at the intersection of County 11th Street and Avenue G. The work consists of removing sharp curve and realignment of Avenue G and County 11th Street and widening to provide exclusive left and right turn lanes. The work also includes aggregate base, asphalt concrete, street light conduit and junction boxes, pavement marking, signing, and other related work.
- Plans:
07-18-25
AZ Maricopa County - Maricopa Highway Number None None (2025054)
- Bid Date:
- July 18, 2025
- Project Type(s)
- Description
- The proposed project is located in Maricopa County on I-10, within the City of Phoenix at 7th Street north and south of I-10, Elliot Road west of I-10, Warner Road west of I-10, Ray Road west of I-10, and Chandler Boulevard west of I-10. The proposed work consists of milling existing asphaltic concrete pavement and replacing it with new asphaltic concrete pavement, fog seal, or micro-surface treatment. The work includes removing and installing curb, curb and gutter, valley gutter, sidewalk, signs, and pavement markings. The work also includes utility adjustments and the installation of street lighting along Elliot Road and …
- Plans:
AZ Mohave County - Mohave Highway Number None None (2024069)
- Bid Date:
- July 18, 2025
- Project Type(s)
- Description
- The proposed project is located on US93 in Mohave County at the Intersection of Chevron Travel Center and US 93, and at the Intersection of TA Express and US 93. The work consists of restriping, signing; along with miscellaneous Asphaltic Concrete placement at the intersections and along the northbound merge lane at the vicinity of Grand Canyon Travel Center and US93 intersection and other related work.
- Plans:
AZ Pinal County - Pinal Highway Number None None (2023097)
- Bid Date:
- July 18, 2025
- Project Type(s)
- Description
- The proposed project is located in Pinal County on SR 187 between mileposts 186.79 and 192.19, near Sacaton. The work consists of removing the existing asphaltic concrete surface course and replacing it with new asphaltic concrete and hot applied chip seal coat. The work also includes right turn lane widening, shoulder widening, pipe and box culvert extension, traffic signal modifications, bridge deck repair, guardrail and guardrail end terminals replacement, pavement markings, signing, and other related work.
- Plans:
Your local Bobcat dealer |
---|
Sierra Machinery |
Ditch Witch West |
Faris Machinery |
Loading...