Recently Updated Bids
04-18-25
AZ Yavapai County - System Preservation (Restoration/Rehab/Resurface) (2025004)
- Bid Date:
- April 18, 2025
- Project Type(s)
- Description
- System Preservation (Restoration/Rehab/Resurface) The proposed project is located in Yavapai County on US 93 approximately 15 miles west of the Town of Wickenburg. The project begins at milepost 172.0 and extends to milepost 185.0. The work consists of milling the existing asphaltic concrete pavement and replacing it with new asphaltic concrete pavement. Additional work includes replacing guardrails and terminals, replacing deck joint, repair bridge deck surface, replacing pavement markings, and other miscellaneous work.
- Plans:
AZ Yavapai County - System Preservation (Restoration/Rehab/Resurface) (2024079)
- Bid Date:
- April 18, 2025
- Project Type(s)
- Description
- System Preservation (Restoration/Rehab/Resurface) The proposed work is located-in Mohave County on I-40 Westbound between mileposts 92.0 and 107.7 between Fort Rock Road and Markham Wash Bridge. The proposed work consists of milling and applying a two-pass micro-surfacing. The project also includes spot repair work by milling and replacing with asphaltic concrete. Additional work includes replacing pavement markings and other miscellaneous work.
- Plans:
04-25-25
NM Bernalillo County 3 District - Bridge Replacement, Roadway Reconstruction, Lighting, ITS (A301001)
- Bid Date:
- April 25, 2025
- Project Type(s)
- Description
- Bridge Replacement, Roadway Reconstruction, Lighting, ITS
- Plans:
05-09-25
AZ Apache County - Tire Anomaly System Installation (2025007)
- Bid Date:
- May 9, 2025
- Project Type(s)
- Description
- Tire Anomaly System Installation The proposed project is located at two Points of Entry (POE) sites on Interstate 40 (I-40), Topock and Sanders. The proposed project consists of installing new Tire Anomaly and Classification Systems (TACS) and integration with the existing screening systems.
- Plans:
AZ Gila County - System Preservation (Restoration/Rehab/Resurface) (2023029)
- Bid Date:
- May 9, 2025
- Project Type(s)
- Description
- System Preservation (Restoration/Rehab/Resurface) The proposed project is located within the Town of Payson, Tonto-Apache Tribe, and Tonto National Forest in Gila County on State Route 87 starting at MP 250.94 and extending north to MP 256.00. The proposed work consists of milling and replacing the existing asphaltic concrete surface. The work also includes constructing curb and gutter, sidewalk, driveways, sidewalk ramps, pavement marking, and other related work.
- Plans:
Your local Bobcat dealer |
---|
Faris Machinery |
Sierra Machinery |
Ditch Witch West |
AZ Maricopa County - Roadway Widening (2025013)
- Bid Date:
- May 9, 2025
- Project Type(s)
- Description
- Roadway Widening The proposed project is located in Maricopa County on Interstate 17 at the Sonoran Desert Drive Traffic Interchange. The proposed work consists of widening the Sonoran Desert Drive NB Off-Ramp to provide for two-lanes. The work includes placing Portland cement concrete pavement, constructing storm drain, replacing pavement markings, installing signs, and other related work.
- Plans:
AZ Maricopa|Maricopa County - System Enhancement (Other Enhancements)
System Enhancement (Other Enhancements) (2025002)
- Bid Date:
- May 9, 2025
- Project Type(s)
- Description
- System Enhancement (Other Enhancements) System Enhancement (Other Enhancements) The proposed work is located on State Route 202 Loop (SR 202L) in Maricopa County, Arizona from Guadalupe Road to Santan Village Parkway. The project begins at MP 32 and ends at MP 41.5 with an approximate length of 9.5 miles. The work consists of replacing High Pressure Sodium (HPS) Luminaires with new Light Emitting Diode (LED) fixtures and other related work. The proposed work is located on State Route 202 Loop (SR 202L) in Maricopa County, Arizona from Val Vista Drive to Southern Avenue. The project begins at approx. MP 18 …
- Plans:
05-16-25
AZ Graham County - Construct Passing Lane (2025014)
- Bid Date:
- May 16, 2025
- Project Type(s)
- Description
- Construct Passing Lane The proposed work is located in Graham County on US 70 between mileposts 287.90 and 289.04, within the San Carlos Apache Tribe Community. The work consists of constructing a passing lane in the westbound direction. The work includes removing the existing asphaltic concrete surface course by milling and replacing it with a bonded wearing course overlay, extending drainage facilities, replacing pavement markings, signing, and other related work.
- Plans:
AZ Pima County - CONSTRUCT MULTI-USE PATH (2024067)
- Bid Date:
- May 16, 2025
- Project Type(s)
- Description
- CONSTRUCT MULTI-USE PATH The proposed project is located in the ADOT Southcentral District in the Town of Oro Valley within Pima County. The project limits are from La Ca�ada Drive to First Ave along Naranja Drive. The work consists of constructing asphaltic concrete multi-use pathway, reconstructing side streets and driveways, culvert extensions, installing signs, constructing retaining walls, placing riprap, installing metal handrails, pavement marking and other related work.
- Plans:
AZ StateWide County - Upgrade Road Weather Information System (2025023)
- Bid Date:
- May 16, 2025
- Project Type(s)
- Description
- Upgrade Road Weather Information System The proposed work is located in Mohave, Coconino, Navajo, Apache, Yavapai, and Cochise Counties, along Interstate 40, Interstate 17, Interstate 10, State Route 377, State Route 77, State Route 260, US Route 60, US Route 93, and US Route 180. The work consists of constructing new road weather information systems (RWIS) and upgrading the existing RWIS.
- Plans: