Rocky Mountain Construction

Dedicated to the people who make our built environment better and safer. We tell your stories and celebrate your successes.

Register with us and receive industry news and content only available to subscribers.

Subscribe
Contacts

Indianapolis, IN, USA (HQ)

903 E. Ohio St., Indianapolis, IN 46202

Call: (317) 423-2325

info@acppubs.com
Location: AZ Apache County
Bid Date/Time: July 17, 2026, 6 p.m.
Project Type:
Status: Active
Description:
The proposed project is located on Interstate 40 in Apache County, in the Northeast District, located at Chambers and the US 191 traffic interchange. The project limits begin at milepost 330.6 and end at milepost 342.2. The project is located partially in Navajo Reservation. The proposed work consists of pavement rehabilitation, includes milling and filling the existing asphaltic concrete of roadway mainline and shoulders, and milled asphalt concrete treatment at designated unpaved crossovers. The work also includes guardrail installation, fence spot repairs, drainage work, bridge repairs, seeding, pavement marking, signing, installing ground-in rumble strips, delineators, traffic control and other related work.
Owners
  • Owner ARIZONA DEPARTMENT OF TRANSPORTATION, 1600 WEST WASHINGTON STREET SUITE 400 PHOENIX AZ 85007