754-ThorpeLaneParkingLot-2025
ID - 754-ThorpeLaneParkingLot-2025
ID - 754-ThorpeLaneParkingLot-2025
Location: TX
Bid Date/Time: April 10, 2025, 7 p.m.
Project Type:
Status: Addendum Posted
Description:
Texas State University is developing property along Thorpe & IH-35 with the intent of providing additional parking. This parking lot will allow students to park and ride buses to campus as well as serve as football game day and other specialuniversity event parking. The property limit of construction is just around 5 acres; therefore, it will need to be permitted for a Large Construction Sitewith TCEQ. The parking lot is primarily asphalt paving with a concrete bus lane and concrete approaches/sidewalks. There are two steel canopy structures thatwill be equipped with Wi-Fi, security cameras, outlets, and one emergency bluephone system. Fiber pathways will be brought from a handhole across Thorpe Lane and trenched across Thorpe Lane to each canopy. The site will have landscaping, an irrigation system, and site furnishings at each canopy. Irrigation anddomestic water will be pulled from an 8” water line located on the property. Additionally, the site will have a new detention pond and storm system which will tie into an existing curb inlet located on Thorpe Lane. Power will bepulled from an adjacent City of San Marcos pole on Thorpe Lane for this project to serve the site’s needs.
Texas State University is developing property along Thorpe & IH-35 with the intent of providing additional parking. This parking lot will allow students to park and ride buses to campus as well as serve as football game day and other specialuniversity event parking. The property limit of construction is just around 5 acres; therefore, it will need to be permitted for a Large Construction Sitewith TCEQ. The parking lot is primarily asphalt paving with a concrete bus lane and concrete approaches/sidewalks. There are two steel canopy structures thatwill be equipped with Wi-Fi, security cameras, outlets, and one emergency bluephone system. Fiber pathways will be brought from a handhole across Thorpe Lane and trenched across Thorpe Lane to each canopy. The site will have landscaping, an irrigation system, and site furnishings at each canopy. Irrigation anddomestic water will be pulled from an 8” water line located on the property. Additionally, the site will have a new detention pond and storm system which will tie into an existing curb inlet located on Thorpe Lane. Power will bepulled from an adjacent City of San Marcos pole on Thorpe Lane for this project to serve the site’s needs.
Project Roles
Project Source Link: Click Here
Your local Stewart-Amos dealer |
---|
Closner Equipment Co Inc |