Texas Contractor

Dedicated to the people who make our built environment better and safer. We tell your stories and celebrate your successes.

Register with us and receive industry news and content only available to subscribers.

Subscribe
Contacts

Indianapolis, IN, USA (HQ)

903 E. Ohio St., Indianapolis, IN 46202

Call: (317) 423-2325

info@acppubs.com
Location: TX
Bid Date/Time: Oct. 6, 2026, 2 p.m.
Project Type:
Status: Active
Description:
·       Re-roofing of an existing science building. This project will consist of two phases. Phase I will be the completion of the main roof replacement, which directly impacts the building’s laboratory ventilation system. Contractor acknowledges that Texas State University laboratory classes will resume immediately following the winter break. Uninterrupted operation of the laboratory ventilation system is a strict requirement for student occupancy, academic instruction, and safety compliance.  Phase II will consist of adjacent roofs which do not have a ventilation system. A Critical Path Method Schedule must be submitted detailing ventilation system coordination, weather contingencies, material procurement lead times, as well as clearly identifying all milestones that must be met in Phase I demonstrating how the winter break deadline will be successfully achieved.
Owners
  • Owner TEXAS DEPARTMENT OF TRANSPORTATION, 125 EAST 11TH STREET AUSTIN TX 78701
Project Source Link: Click Here
JCB Inc - Construction Eq
Your local JCB North America dealer
South Star JCB/Meinecke
Monk JCB
BOSS JCB