Current Bids
01-28-26
MN ISANTI | KANABEC County 3 District - LOCATED ON T.H. 65 FROM KING ROAD IN BRUNSWICK TO 1000' SOUTH OF 357TH AVE NORTH EAST IN CAMBRIDGE. (250118)
- Bid Date:
- January 28, 2026
- Project Type(s)
- Description
- LOCATED ON T.H. 65 FROM KING ROAD IN BRUNSWICK TO 1000' SOUTH OF 357TH AVE NORTH EAST IN CAMBRIDGE. 3004-65 (TH 65=005), 3009-21 (TH 65=189), 3313-17 (TH 65=189) STBG 3026(044) In Isanti & Kanabec Counties on TH 65 from King Road to 1000 Ft South of 357th Ave North East Grading, Bit. Milling, and Surfacing, Cold In-Place Recycle, ADA Improvements and Lighting 11.163
- Plans:
MN WINONA County 6 District - LOCATED ON T.H. 90 WB FROM 2.30 MILES EAST OF T.H. 74 TO 0.50 MILES WEST OF T.H. 43. (250128)
- Bid Date:
- January 28, 2026
- Project Type(s)
06-23-26
MN ST LOUIS County 1 District - LOCATED ON T.H.535, T.H.53, AND T.H.35 BETWEEN DULUTH & SUPERIOR WISCONSIN OVER ST LOUIS RIVER IN ST. LOUIS COUNTY-MN AND DOUGLAS COUNTY-WI. (260701)
- Bid Date:
- June 23, 2026
- Project Type(s)
- Description
- LOCATED ON T.H.535, T.H.53, AND T.H.35 BETWEEN DULUTH & SUPERIOR WISCONSIN OVER ST LOUIS RIVER IN ST. LOUIS COUNTY-MN AND DOUGLAS COUNTY-WI. SP6981-26, SP6981-69913, REPLACE BLATNIK BRIDGE #9030 WITH NEW BRIDGE #69913 ON T.H.535, T.H.53, AND T.H.35 BETWEEN DULUTH & SUPERIOR WISCONSIN OVER ST LOUIS RIVER IN ST. LOUIS COUNTY-MN AND DOUGLAS COUNTY-WI. REMOVAL OF BRIDGE #9030; CONSTRUCTION OF BRIDGES 69913, WI B-16-0155, AND WI B-16-0154, CONSTRUCTION OF RAMPS AND ROUNDABOUTS, LOCAL STREETS, RETAINING WALLS, ADA IMPROVEMENTS, LIGHTING, PERMANENT INTELLIGENT TRANSPORTATION SYSTEMS, ROADWAY AND WEATHER INFORMATION SYSTEMS, FIBER OPTICS, AND DYNAMIC MESSAGE SIGNS, UTILITIES, PERMANENT SIGNING AND STRIPING, STORMWATER TREATMENT …
- Plans: