Recently Updated Bids
09-23-26
MN HENNEPIN County - 2781-577 (TH 94 = 392) State Funds In Hennepin County on TH 94 At Lowry Hill Tunnel CO Modifications and Fire Alarm 0 (260142)
- Bid Date:
- September 23, 2026
- Project Type(s)
MN LINCOLN, LYON County - RECONSTRUCTION RURAL - LINCOLN, LYON (260113)
- Bid Date:
- September 23, 2026
- Project Type(s)
- Description
- 4102-27 (T.H. 14=7) 4107-19 (T.H. 75=6) SAP 041-621-009 NHPP 0014(351) In Lincoln and Lyon Counties on TH 14 from 0.05 Miles West of TH 75 to 1.59 Miles West of TH 23 and in Lincoln County on TH 75 from 0.62 Miles South of TH 14 to TH 14 and on Benton ST at Grant ST Grading, Bituminous Mill & Overlay, Cold In-Place Recycle, and ADA Improvements; Grading, Bituminous Surfacing, Retaining Walls, ADA Improvements & Lighting. 11.901 Miles
- Plans:
MN MILLE LACS County - 4801- 26 (TH 23 = 23) 4802-26 (TH23 = 23) SAP 048-602-022, SAP 048-636-005, SAP 048-637-004, SP 048-602-020, SP 048-632-002 PRO-HSIP-NHPP 4827(039) In Mille Lacs County on TH 23 from 264 FEET W OF RUM (260117)
- Bid Date:
- September 23, 2026
- Project Type(s)
- Description
- 4801- 26 (TH 23 = 23) 4802-26 (TH23 = 23) SAP 048-602-022, SAP 048-636-005, SAP 048-637-004, SP 048-602-020, SP 048-632-002 PRO-HSIP-NHPP 4827(039) In Mille Lacs County on TH 23 from 264 FEET W OF RUM RIVER to 528 FEET E OF CSAH 2/105TH AVE GRADING, BITUMINOUS AND CONCRETE SURFACING, ROUNDABOUTS, ADA IMPROVEMENTS, RETAINING WALLS, PEDESTRIAN CROSSWALK FLASHER SYSTEM, AND LIGHTING 1.931 Miles
- Plans:
10-21-26
MN NOBLES County - SP 5304-41 (TH 59=016) RAISE 5927(024) In Nobles County on TH 59 From TH 60 to 27th St N (260119)
- Bid Date:
- October 21, 2026
- Project Type(s)
| Your local Gomaco dealer |
|---|
| Gomaco -Contact For a Dealer Near You |
10-28-26
MN BENTON, MORRISON County - SP 4901-82 (TH 10 = 27), 0502-118 (TH 10 = 27) NHPP 0010(344) In Benton County on TH 10 From 0 (260125)
- Bid Date:
- October 28, 2026
- Project Type(s)
- Description
- SP 4901-82 (TH 10 = 27), 0502-118 (TH 10 = 27) NHPP 0010(344) In Benton County on TH 10 From 0.15 Miles South East of Halfway Crossing NW to Benton/Morrison Co. Line and in Morrison County on TH 10 From 0.69 Miles North West of CSAH 26 to 0.19 Miles North West of CSAH 35. Grading, Full-Depth Reclamation, Cold In-Place Recycle/CCPR Bituminous, Bituminous Surfacing, J-Turn, Moment Slab, ADA Improvements, High Tension Cable Guardrail, and Lighting. 9.605 Miles.
- Plans:
MN HENNEPIN, WRIGHT County - 2738-31 (TH 101=187) 8608-33 (TH 101=187) NHPP-HSIP 0101(301) In Hennepin and Wright Counties on TH 101 from 0 (260131)
- Bid Date:
- October 28, 2026
- Project Type(s)
- Description
- 2738-31 (TH 101=187) 8608-33 (TH 101=187) NHPP-HSIP 0101(301) In Hennepin and Wright Counties on TH 101 from 0.1 MiIe South of TH 94 to 0.5 MI South of CSAH 38 (70th ST NE) Grading, Bituminous Milling and Surfacing, ADA Improvements, TMS, Signals, and Bridge No. 27020 and 27945 3.533 Miles
- Plans:
MN KANDIYOHI County - 3403-84 (TH 12=010) STATE FUNDS In Kandiyohi on TH 12 at CSAH 55 (260143)
- Bid Date:
- October 28, 2026
- Project Type(s)
MN LAKE County - 3804-62 (TH 61=1), SP 038-090-009, SP 038-080-001, SAP 038-030-015 NHPP-HSIP-CRP-TA-STBG 3827(040) In Lake County on TH 61 From 0 (260116)
- Bid Date:
- October 28, 2026
- Project Type(s)
- Description
- 3804-62 (TH 61=1), SP 038-090-009, SP 038-080-001, SAP 038-030-015 NHPP-HSIP-CRP-TA-STBG 3827(040) In Lake County on TH 61 From 0.42 Miles West of Scenic Dr. to 0.22 Miles East of Park Rd. Grading, Bituminous and Concrete Surfacing, Roundabouts, High Tension Cable Guardrail, Retaining Walls, Signals, Pedestrian Crosswalk Flasher Systems, TMS, Lighting, and ADA Improvements. 2.465 Miles
- Plans:
| Your local Komatsu America Corp dealer |
|---|
| Road Machinery and Supplies Company |
Loading...