removal and replacement of existing Hot Mix Asphalt (HMA), pavement patching, Portland Cement Concrete (PCC) overlay, curb and gutter removal and replacement, routing, cleaning, and sealing of longitu
ID - 80C93
ID - 80C93
Location: IL Lake County 1 District
Bid Date/Time: Nov. 6, 2026, noon
Project Type:
Status: Awarded
Description:
(1.630-Mile) Standard Overlay and Curb Ramps Improvements (ADA Improvements) consists of removal and replacement of existing Hot Mix Asphalt (HMA), pavement patching, Portland Cement Concrete (PCC) overlay, curb and gutter removal and replacement, routing, cleaning, and sealing of longitudinal cracks in existing HMA pavement, thermoplastic pavement markings, pedestrian signals improvements (APS), detector loop replacement, raised reflective pavement markers, sidewalk curb ramps improvement. The improvement is in the City of Waukegan in Lake County.
(1.630-Mile) Standard Overlay and Curb Ramps Improvements (ADA Improvements) consists of removal and replacement of existing Hot Mix Asphalt (HMA), pavement patching, Portland Cement Concrete (PCC) overlay, curb and gutter removal and replacement, routing, cleaning, and sealing of longitudinal cracks in existing HMA pavement, thermoplastic pavement markings, pedestrian signals improvements (APS), detector loop replacement, raised reflective pavement markers, sidewalk curb ramps improvement. The improvement is in the City of Waukegan in Lake County.
Project Roles
Owners
- Owner ILLINOIS DEPARTMENT OF TRANSPORTATION, 400 EAST WASHINGTON STREET SPRINGFIELD IL 62706
Bidders
- Bidder PETER BAKER & SON CO., - $3,548,522, 1349 Rockland Road Lake Bluff IL 60044
- Bidder PAYNE & DOLAN INC., - $3,823,779, 801 Clark Dr Gladstone MI 49837
Apparent Low Bidder: PETER BAKER & SON CO.