Current Bids
11-04-26
AR - THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 3.373 MILES OF HIGHWAY 167 IN... (A70049)
- Bid Date:
- November 4, 2026
- Project Type(s)
- Description
- THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 3.373 MILES OF HIGHWAY 167 IN CALHOUN COUNTY. THIS PROJECT CONSISTS OF FOG SEAL, ACHM SURFACE COURSE, COLD MILLING ASPHALT PAVEMENT, MAINTENANCE OF TRAFFIC, RUMBLE STRIPS AND STRIPES, PAVEMENT MARKING, AND MISC. ITEMS.
- Plans:
AR - THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY AND PLACE ULTRATHIN BONDED WEARING COURSE ON... (A80050)
- Bid Date:
- November 4, 2026
- Project Type(s)
- Description
- THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY AND PLACE ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 13.159 MILES OF HIGHWAY 65 IN VAN BUREN COUNTY. THIS PROJECT CONSISTS OF AGGREGATE SURFACE COURSE, ACHM SURFACE COURSE, ULTRATHIN BONDED WEARING COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, RUMBLE STRIPS, PAVEMENT MARKING, AND MISC. ITEMS.
- Plans:
AR - THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY AND PLACE ULTRATHIN BONDED WEARING COURSE ON... (A50033)
- Bid Date:
- November 4, 2026
- Project Type(s)
- Description
- THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY AND PLACE ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 5.952 MILES OF HIGHWAY 367 IN WHITE COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL OF GUARDRAIL, AGGREGATE BASE COURSE, ACHM BINDER AND SURFACE COURSES, ULTRATHIN BONDED WEARING COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, GUARDRAIL, EROSION CONTROL, RUMBLE STRIPES, LOOP WIRING, PAVEMENT MARKING, AND MISC. ITEMS.
- Plans:
AR - THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 11.620 MILES OF HIGHWAY 375 IN POLK COUNTY.... (A40062)
- Bid Date:
- November 4, 2026
- Project Type(s)
- Description
- THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 11.620 MILES OF HIGHWAY 375 IN POLK COUNTY. THIS PROJECT CONSISTS OF TRENCHING AND SHOULDER PREPARATION, ACHM BINDER AND SURFACE COURSES, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, EROSION CONTROL, PAVEMENT MARKING, AND MISC. ITEMS.
- Plans:
AR - THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 11.203 MILES OF HIGHWAY 412 IN... (A90051)
- Bid Date:
- November 4, 2026
- Project Type(s)
- Description
- THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 11.203 MILES OF HIGHWAY 412 IN CARROLL AND MADISON COUNTIES. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL OF GUARDRAIL, ACHM SURFACE COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, GUARDRAIL, RUMBLE STRIPS AND STRIPES, PAVEMENT MARKING, AND MISC. ITEMS.
- Plans:
| Your local Bomag Americas dealer |
|---|
| WPI |
AR - THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 18.474 MILES OF HIGHWAY 73 IN... (A30049)
- Bid Date:
- November 4, 2026
- Project Type(s)
- Description
- THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 18.474 MILES OF HIGHWAY 73 IN HEMPSTEAD AND HOWARD COUNTIES. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL OF GUARDRAIL, AGGREGATE BASE COURSE, ACHM SURFACE COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, GUARDRAIL, EROSION CONTROL, RUMBLE STRIPS, PAVEMENT MARKING, AND MISC. ITEMS.
- Plans:
AR - THE PURPOSE OF THIS PROJECT IS TO PLACE CHIP SEAL AND FOG SEAL APPROXIMATELY 9.670 MILES OF HIGHWAY... (A10059)
- Bid Date:
- November 4, 2026
- Project Type(s)
- Description
- THE PURPOSE OF THIS PROJECT IS TO PLACE CHIP SEAL AND FOG SEAL APPROXIMATELY 9.670 MILES OF HIGHWAY 85 IN PHILLIPS COUNTY. THIS PROJECT CONSISTS OF EARTHWORK, TRENCHING AND SHOULDER PREPARATION, AGGREGATE BASE COURSE, FOG SEAL, ASPHALT SURFACE TREATMENT, ACHM BINDER AND SURFACE COURSES, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, APPROACH GUTTERS, MAINTENANCE OF TRAFFIC, GUARDRAIL, EROSION CONTROL, RUMBLE STRIPS AND STRIPES, LOOP WIRING, PAVEMENT MARKING, AND MISC. ITEMS.
- Plans:
AR - THE PURPOSE OF THIS PROJECT IS TO IMPROVE THE INTERSECTION ON HIGHWAYS 61 AND 140 IN MISSISSIPPI... (101141)
- Bid Date:
- November 4, 2026
- Project Type(s)
- Description
- THE PURPOSE OF THIS PROJECT IS TO IMPROVE THE INTERSECTION ON HIGHWAYS 61 AND 140 IN MISSISSIPPI COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL ITEMS, STONE BACKFILL, EARTHWORK, AGGREGATE BASE COURSE, ACHM BASE, BINDER, AND SURFACE COURSES, COLD MILLING ASPHALT PAVEMENT, PORTLAND CEMENT CONCRETE DRIVEWAY, MAINTENANCE OF TRAFFIC, CONCRETE DITCH PAVING, MINOR DRAINAGE, EROSION CONTROL, CONCRETE ISLAND, WALKS, AND CURB, WHEELCHAIR RAMPS, TRAFFIC SIGNAL ITEMS, PAVEMENT MARKINGS, AND MISC. ITEMS.
- Plans:
AR - THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 5.078 MILES OF HIGHWAY 338 IN... (A60066)
- Bid Date:
- November 4, 2026
- Project Type(s)
- Description
- THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 5.078 MILES OF HIGHWAY 338 IN PULASKI COUNTY. THIS PROJECT CONSISTS OF EARTHWORK, AGGREGATE BASE COURSE, HIMOD ASPHALT SURFACE COURSE, ACHM SURFACE COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, RADAR DETECTION SYSTEM, PAVEMENT MARKING, AND MISC. ITEMS.
- Plans:
AR - THE PURPOSE OF THIS PROJECT IS TO RECONSTRUCT APPROXIMATELY 1.525 MILES OF COUNTY ROAD 73 IN BAXTER... (FA0314)
- Bid Date:
- November 4, 2026
- Project Type(s)
- Description
- THE PURPOSE OF THIS PROJECT IS TO RECONSTRUCT APPROXIMATELY 1.525 MILES OF COUNTY ROAD 73 IN BAXTER COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISPOSAL ITEMS, EARTHWORK, AGGREGATE BASE COURSE, ACHM SURFACE COURSE, MAINTENANCE OF TRAFFIC, MINOR DRAINAGE STRUCTURES, DBL. 9' X 6' X 82' THREE-SIDED CAST-IN-PLACE CULVERT (TOTAL SPAN LENGTH 28.31 FT.), EROSION CONTROL ITEMS, PAVEMENT MARKING, AND MISC. ITEMS.
- Plans:
| Your local Trimble dealer |
|---|
| Kirby-Smith Machinery |
| WPI |
Loading...