Recently Updated Bids
01-14-26
LA Avoyelles County - Avoyelles (H.016292.6)
- Bid Date:
- January 14, 2026
- Project Type(s)
02-11-26
LA Natchitoches County 08 District - Natchitoches (H.016297.6)
- Bid Date:
- February 11, 2026
- Project Type(s)
LA Vermilion County 03 District - Vermilion (H.010226.6)
- Bid Date:
- February 11, 2026
- Project Type(s)
02-24-26
LA East Baton Rouge County 61 District - AREA A: DRAINAGE STRUCTURE REPLACEMENT (4400033358)
- Bid Date:
- February 24, 2026
- Project Type(s)
- Description
- AREA A: DRAINAGE STRUCTURE REPLACEMENT
- Plans:
03-04-26
AR BAXTER County 09 District - SEARCY CO. LINE ? STONE CO. LINE (S) (A90039)
- Bid Date:
- March 4, 2026
- Project Type(s)
- Description
- SEARCY CO. LINE ? STONE CO. LINE (S) THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 7.430 MILES OF HIGHWAY 14 IN BAXTER COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL ITEMS, EARTHWORK, TRENCHING AND SHOULDER PREPARATION, AGGREGATE BASE COURSE, ACHM BINDER AND SURFACE COURSES, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, MINOR DRAINAGE STRUCTURES, EROSION CONTROL, RUMBLE STRIPES, PAVEMENT MARKING, AND MISC. ITEMS.
- Plans:
| Your local Wirtgen America dealer |
|---|
| Kirby-Smith Machinery |
AR BRADLEY County 07 District - HERMITAGE ? HWY. 8 (S) (A70041)
- Bid Date:
- March 4, 2026
- Project Type(s)
- Description
- HERMITAGE ? HWY. 8 (S) THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 17.066 MILES OF HIGHWAY 160 IN BRADLEY COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL OF GUARDRAIL, TRENCHING AND SHOULDER PREPARATION, AGGREGATE BASE COURSE, ACHM SURFACE COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, APPROACH GUTTERS, MAINTENANCE OF TRAFFIC, GUARDRAIL, EROSION CONTROL, RUMBLE STRIPS AND STRIPES, PAVEMENT MARKING, AND MISC. ITEMS.
- Plans:
AR LEE | PHILLIPS County 01 District - HWY. 49 ? HWY. 243 (SEL. SECS.) (S) (A10031)
- Bid Date:
- March 4, 2026
- Project Type(s)
- Description
- HWY. 49 ? HWY. 243 (SEL. SECS.) (S) THE PURPOSE OF THIS PROJECT IS TO MILL, OVERLAY, AND PLACE ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 18.574 MILES OF HIGHWAYS 1 AND 1B IN LEE AND PHILLIPS COUNTIES. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, FOG SEAL, ACHM SURFACE COURSE, ULTRATHIN BONDED WEARING COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, RUMBLE STRIPS, LOOP WIRING, PAVEMENT MARKING, AND MISC. ITEMS.
- Plans:
AR LITTLE RIVER County 03 District - ASHDOWN ? HWY. 317 (S) (A30029)
- Bid Date:
- March 4, 2026
- Project Type(s)
- Description
- ASHDOWN ? HWY. 317 (S) THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY APPROXIMATELY 6.946 MILES OF HIGHWAY 32 IN LITTLE RIVER COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ACHM SURFACE COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, RUMBLE STRIPS AND STRIPES, LOOP WIRING, PAVEMENT MARKING, AND MISC. ITEMS.
- Plans:
AR PERRY | PULASKI County 06 District - HWY. 9 ? GOODSON RD. (S) (AX0009)
- Bid Date:
- March 4, 2026
- Project Type(s)
- Description
- HWY. 9 ? GOODSON RD. (S) THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 15.525 MILES OF HIGHWAY 10 IN PERRY AND PULASKI COUNTIES. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ACHM SURFACE COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, RUMBLE STRIPS, PAVEMENT MARKING, AND MISC. ITEMS.
- Plans:
01-14-26
| Your local Case Construction Equipment Inc dealer |
|---|
| ASCO Equipment |
Loading...