Current Bids
01-07-25
FL LAKE SUMTER MARION BREVARD County D5 District - LAKE SUMTER MARION BREVARD Highway Number None Maintenance Other (E59C0-R0)
- Bid Date:
- January 7, 2025
- Project Type(s)
- Description
- LETTING LOCATION: 719 S. Woodland Blvd. POSTING DATES: 01/21/2025 and 01/28/2025 CONTRACT DAYS: 365 CONTRACT EXECUTION DAYS: 10 SPECIAL START DATE: N/A ACQUIS./FLEXIBLE START TIME: 0 FDOT District 5 Proposal ID No.: E59C0 Financial Project No.: 444100-1-72-16 Fiscal Year: 2025 Counties: Districtwide (Volusia, Flagler, Brevard, Orange, Seminole, Osceola, Lake, Sumter, Marion) Contract Calendar Days: 365 This is a Maintenance Work Document driven Contract with a budget estimate of $600,000.00. The Contract will be awarded at the budget estimate amount. This Contract includes an option for renewal. Intent: The work under this Contract consists of the replacement of pavement markings and …
- Plans:
FL LAKE SUMTER MARION BREVARD County D5 District - LAKE SUMTER MARION BREVARD Highway Number None Maintenance Other (E51D9-R0)
- Bid Date:
- January 7, 2025
- Project Type(s)
- Description
- LETTING LOCATION: 719 S. Woodland Blvd. POSTING DATES: 01/21/2025 and 01/28/2025 CONTRACT DAYS: 365 CONTRACT EXECUTION DAYS: 10 SPECIAL START DATE: N/A ACQUIS./FLEXIBLE START TIME: 0 FDOT District 5 Proposal ID No.: E51D9 Financial Project No.: 427958-1-72-27 Fiscal Year: 2025 Counties: Lake & Orange Calendar Days: 365 This is a Maintenance Work Document driven Contract with a budget estimate of $500,000. The Contract will be awarded at the budget estimate amount. This Contract includes an option for renewal. Intent: The work under this Contract consists of small & large machine mowing, slope mowing, litter removal, edging, mechanical sweeping and chemical …
- Plans:
FL LAKE SUMTER MARION BREVARD County D5 District - LAKE SUMTER MARION BREVARD Highway Number None Maintenance Other (E59C2)
- Bid Date:
- January 7, 2025
- Project Type(s)
- Description
- LETTING LOCATION: 719 S. Woodland Blvd. POSTING DATES: 01/21/2025 and 01/28/2025 CONTRACT DAYS: 220 CONTRACT EXECUTION DAYS: 10 SPECIAL START DATE: N/A ACQUIS./FLEXIBLE START TIME: 14 FDOT District 5 Proposal No.: E59C2 Financial Project No.: 444100-1-72-17 Fiscal Year: 2025 County: Lake Contract Calendar Days: 220 Lead Time: 14 Days This is a Maintenance Pay Item Contract. Intent: The work under this Contract consists of the replacement of thermoplastic pavement markings and RPMs in various locations on State maintained roadways in Lake County. Experience: For this contract, the Contractor is required to have at least three (3) years of experience in …
- Plans:
01-08-25
FL HILLSBOROUGH County D7 District - HILLSBOROUGH Highway Number 1004 Miscellaneous Construction (E7Q85)
- Bid Date:
- January 8, 2025
- Project Type(s)
- Description
- LETTING LOCATION: Tampa POSTING DATES: 01/27/2025 and 01/30/2025 CONTRACT DAYS: 180 CONTRACT EXECUTION DAYS: 10 SPECIAL START DATE: N/A ACQUIS./FLEXIBLE START TIME: 120 Days Flex Start The Improvements under this Contract consist of one pedestrian signal with mid-block crossing and safety enhancements on SR 45 (US 41/Nebraska Ave.) from Idlewild Ave. to East Paris Street in Hillsborough County. Prequalification required.
- Plans:
FL HILLSBOROUGH County D7 District - HILLSBOROUGH Highway Number 1025 Resurfacing (E7Q74)
- Bid Date:
- January 8, 2025
- Project Type(s)
- Description
- LETTING LOCATION: Tampa POSTING DATES: 01/27/2025 and 01/30/2025 CONTRACT DAYS: 210 CONTRACT EXECUTION DAYS: 10 SPECIAL START DATE: N/A ACQUIS./FLEXIBLE START TIME: 120 Days Flex Start The Improvements under this Contract consist of milling, resurfacing, signing, pavement marking, signals, concrete ditch pavement, curb and gutter, erosion controls, and other incidental construction from W of US 301 to E of US 41/50th St on SR 676/Causeway Blvd in Hillsborough County. Note the Substituted Commercial General Liability Insurance requirements contained in section(s) 7-13.2, 7-13.4, and 7-13.3.1 of the project Specifications. Prequalification required.
- Plans:
Your local Trimble Construction Division dealer |
---|
SITECH Mid-South |
SITECH South |
SITECH Tri-Rivers |
01-09-25
FL GULF County D3 District - GULF Highway Number 5101 Resurfacing (E3X91)
- Bid Date:
- January 9, 2025
- Project Type(s)
- Description
- LETTING LOCATION: 1074 HWY 90 POSTING DATES: 01/30/2025 and 02/13/2025 CONTRACT DAYS: 256 CONTRACT EXECUTION DAYS: 10 SPECIAL START DATE: N/A ACQUIS./FLEXIBLE START TIME: 120 Days Flexible The Improvements under this District Contract consist of, but are not limited to, MOT (standard, barrier, pedestrian LCD, PCMS, barricade), protections (sediment barrier, inlets), base course, asphalt (milling, resurfacing), friction course, concrete (shoulder gutter, sidewalk, driveways), drainage (inlets, manholes, culvert), pavement markings (midblock crosswalk, painted, thermoplastic, RPM), signing (single-column, sign-column remove, panel relocate, solar sign assembly), lighting (cable F&I, conductors, light pole F&I, luminaire & bracket arm replace), electrical (power service, service wire), …
- Plans:
FL LIBERTY County D3 District - LIBERTY Highway Number 5606 Bridge Repair (E3Y07)
- Bid Date:
- January 9, 2025
- Project Type(s)
- Description
- LETTING LOCATION: 1074 HWY 90 POSTING DATES: 01/30/2025 and 02/13/2025 CONTRACT DAYS: 120 CONTRACT EXECUTION DAYS: 10 SPECIAL START DATE: N/A ACQUIS./FLEXIBLE START TIME: 30 Days Flex. The Improvements under this District Contract consist of CR 67 over Yellow Creek Bridge No. 564069 replacement of bearing pads and other incidental work, such as bridge jacking in Liberty County, Florida (56060). PREQUALIFICATION IS REQUIRED TO BID ON THIS PROJECT Marine General Liability Insurance as referenced in Section 7-13.5 of the FDOT Standard Specifications may be required if any work under this Contract is performed using vessel(s)*. Prior to the Contract execution, …
- Plans:
FL WALTON County D3 District - WALTON Highway Number 6002 Maintenance Other (E3X78)
- Bid Date:
- January 9, 2025
- Project Type(s)
- Description
- LETTING LOCATION: 1074 HWY 90 POSTING DATES: 01/30/2025 and 02/13/2025 CONTRACT DAYS: 935 CONTRACT EXECUTION DAYS: 10 SPECIAL START DATE: N/A ACQUIS./FLEXIBLE START TIME: 30 Day Flexible The Improvements under this District Contract, SR 30 (US 98) from Sandestin Lane to Hunters Road, consists of providing the labor, material, and equipment necessary to complete this landscaping project located in Walton County. Proposed improvements include, but are not limited to, new landscaping and irrigation for roadway medians. Details of this project are shown in the Contract Plans. A total of 205 Contract days will be allowed for the installation period and …
- Plans:
FL WALTON DIST/ST-WIDE County D3 District - WALTON DIST/ST-WIDE Highway Number None Maintenance Other (E3Y52-R0)
- Bid Date:
- January 9, 2025
- Project Type(s)
- Description
- LETTING LOCATION: 1074 HWY 90 POSTING DATES: 01/30/2025 and 02/13/2025 CONTRACT DAYS: CONTRACT EXECUTION DAYS: 10 SPECIAL START DATE: N/A ACQUIS./FLEXIBLE START TIME: 15 DAYS The Improvements under this Work Document-Driven Contract consist of routine maintenance of specified storm water retention ponds and outfall ditches in Walton County and includes the mowing of grassed and vegetated areas, the removal and disposal of litter and other objectionable debris, the cleaning of all vines and other vegetation from the fence fabric, and hand trimming at the bottom of the fence, as applicable. All gates for fenced retention ponds shall be locked after …
- Plans:
FL WALTON DIST/ST-WIDE County D3 District - WALTON DIST/ST-WIDE Highway Number None Maintenance Other (E3Y51)
- Bid Date:
- January 9, 2025
- Project Type(s)
- Description
- LETTING LOCATION: 1074 HWY 90 POSTING DATES: 01/30/2025 and 02/13/2025 CONTRACT DAYS: CONTRACT EXECUTION DAYS: 10 SPECIAL START DATE: N/A ACQUIS./FLEXIBLE START TIME: 15 DAYS The improvements under this Work Document-Driven Contract consist of the placement of Bank and Shore Rubble as well as Ditch Lining Rubble along various roadways in Walton County. This rubble will be used to fill, re-contour and restore eroded slope and ditch bottoms. Periodic lane closures will be required. Removal and replacement of guardrail may be necessary to accomplish dumping and spreading of rubble. All guardrail to be replaced at the end of each workday. …
- Plans:
Your local Takeuchi Mfg Ltd dealer |
---|
Power Equipment Co |
Loading...