Current Bids
01-07-25
AK Ketchikan Gateway County SR District - KTN N. Tongass Hwy Resurface: A/P F.T. to Ward Creek Bridge Stage 1 (SFHWY00536)
- Bid Date:
- January 7, 2025
- Project Type(s)
01-08-25
AK Kenai Peninsula County CR District - KENAI PENINSULA BRIDGE DECK REHABILITATIONS FY2023 (CFHWY00946)
- Bid Date:
- January 8, 2025
- Project Type(s)
- Description
- KENAI PENINSULA BRIDGE DECK REHABILITATIONS FY2023 This federally funded project will rehabilitate bridge No.673 and No. 675 near Cooper Landing. Project work includespolyester concrete overlays, structural retrofits,miscellaneous structural repairs, expansion joints, bridgerail upgrades, guardrail and end terminals, paving,signing, and striping.
- Plans:
AK Kenai Peninsula County NR District - Eminent Domain Appraisal Review Services for Safer Seward Hwy MP 98.5-118 (25251019)
- Bid Date:
- January 8, 2025
- Project Type(s)
01-09-25
AK CR District - Northern Region Facilities 2024 Job Order Construction Contract (PF-JOCC-2024-NR)
- Bid Date:
- January 9, 2025
- Project Type(s)
- Description
- Northern Region Facilities 2024 Job Order Construction Contract This state funded indefinite delivery / indefinitequantity contract is for performing maintenance, repair,and minor construction work related to Northern Regionfacilities. Contractor shall be responsible for both designand construction work.
- Plans:
MT Beaverhead County 2 District - BARRETTS - DILLON (05B24R)
- Bid Date:
- January 9, 2025
- Project Type(s)
- Description
- BARRETTS - DILLON The Barretts ? Dillon project is located on InterstateRoute 15 (I-15) in Beaverhead County. The project beginssouth of the Barretts Interchange (Exit 56) at Mile Post54.6 and proceeds north 8.7 miles ending at the northbridge end of the Park Street Grade Separation at Mile Post63.3 The intent of this project is to resurface theroadway. Proposed work includes crack seal, seal and cover(chip seal), and updated pavement markings.
- Plans:
Your local Gomaco dealer |
---|
American Construction Supply |
Tri-State Truck & Equipment Inc |
MT Custer County 4 District - SF 189 S OF MILES CITY SHLD WID (01125)
- Bid Date:
- January 9, 2025
- Project Type(s)
- Description
- SF 189 S OF MILES CITY SHLD WID The SF 189 South of Miles City Shoulder Widening projectis a 2.3-mile-long project on MT Highway 59. The project islocated approximately 24 miles south of Miles City inCuster County. The project is between reference post 25.5and reference post 27.8. Work includes construction of new6-ft. shoulders with rumble strips on each side of the roadand flattening of the roadside slopes.
- Plans:
MT Hill County 3 District - HAVRE - NORTHWEST (S-232) (07B24)
- Bid Date:
- January 9, 2025
- Project Type(s)
- Description
- HAVRE - NORTHWEST (S-232) Reconstruction, grading, gravel, widening, plant mixsurfacing, cold milling, drainage, fencing, guardrail,signing and striping on the Havre-Northwest (S-232) projectin Hill County. The project is located along Secondary 232(S-232) from RP 0.757 to RP 10.0.
- Plans:
MT Lewis and Clark County 3 District - HELENA - NORTH (09R23)
- Bid Date:
- January 9, 2025
- Project Type(s)
- Description
- HELENA - NORTH The Helena - North project is a scrub seal to bothdirections of I-15 as well as bridge deck preservation workaround the Helena area. The project begins at the Lewis andClark/Jefferson County line (RP 189.9) and extends north toRP 200.4. All interchange ramps within these limits willreceive a scrub seal, except for the 3 ramps at the LincolnInterchange called out in the plans.
- Plans:
MT McCone County 4 District - CIRCLE - NORTHWEST (02125)
- Bid Date:
- January 9, 2025
- Project Type(s)
- Description
- CIRCLE - NORTHWEST The Circle ? Northwest project is a 7-mile-longresurfacing project on Secondary 252 (Horse Creek Road)beginning in Circle at the intersection with MT 200 (1stAvenue), reference post 0.0, and extending 7 milesnorthwest ending just before the Denwoody Creek Bridge atreference post 7.0. This project includes a mill andoverlay, seal and cover, upgraded signing, delineation, andpavement markings. The purpose of the project is to extendthe life of the existing pavement to provide a safer,smoother ride and reduce maintenance costs.
- Plans:
MT Pondera County 3 District - VALIER - WEST (03125)
- Bid Date:
- January 9, 2025
- Project Type(s)
- Description
- VALIER - WEST The project is located on Montana 44 and begins at theintersection of US 89 and MT 44, RP 0.00 and extends eastto RP 14.1, in the Town of Valier. Work will includemilling from RP 3.0 to RP 13.6, 5 digout locations, 5existing culverts will be removed and replaced, 7 existingculverts will be lined, and the entire project will receivea seal and cover. New pavement markings will be placed onthe entire project and centerline rumble strips will be cutbetween RP 3.0 and RP 12.86.
- Plans:
Your local Superior dealer |
---|
Westate Machinery Co |
Loading...