Current Bids
12-03-24
ID Clearwater County 28121 District - SH-21, QUARTZ CR (JAYPE) BRIDGE (20404240905)
- Bid Date:
- December 3, 2024
- Project Type(s)
12-04-24
AK Matanuska-Susitna County CR District - HSIP: CHURCH RD AND SPRUCE AVE INTERSECTION FLASHING BEACON (CFHWY00883)
- Bid Date:
- December 4, 2024
- Project Type(s)
AK NR District - Term Agreement for Statewide Communication Support Services 2025 (25251004)
- Bid Date:
- December 4, 2024
- Project Type(s)
- Description
- Term Agreement for Statewide Communication Support Services 2025 Professional services to provide formatted media on an as-needed basis for various internal and external communications purposes. Examples of deliverables include original content creation or editing of data (infographics/charts), figures, fliers, brochures, reports, presentations, website content, videos, and GIS mapping.
- Plans:
12-05-24
AK Matanuska-Susitna County NR District - Knik Arm Tunnel Feasibility Study (25251013)
- Bid Date:
- December 5, 2024
- Project Type(s)
- Description
- Knik Arm Tunnel Feasibility Study
- Plans:
MT Beaverhead|Deer Lodge|Gallatin|Jefferson County 2 District - SF 209 BUTTE DIST SIGNS (03C24)
- Bid Date:
- December 5, 2024
- Project Type(s)
- Description
- SF 209 BUTTE DIST SIGNS Description. The SF 209 Butte District Signs project includes signing, roadside and barrier rail delineation, pavement markings, radar activated solar warning beacon, radar activated solar LED curve signs, and scale site signing/electrical at 29 sites within the Butte District. Sites include 1 through 23, and Sites 25 through 30. Work at Site 24 will be performed by others and is shown for information only. Work sites are within Beaverhead, Deer Lodge, Lewis & Clark, Gallatin, Jefferson, Madison, Park, Powell, and Silver Bow counties. Locations include the following: Site 1- US-212 RP 0.000 to RP 8.550 …
- Plans:
Your local Superior dealer |
---|
Westate Machinery Co |
MT Deer Lodge County 2 District - PENNSYLVANIA WALKS - ANACONDA (06C24)
- Bid Date:
- December 5, 2024
- Project Type(s)
- Description
- PENNSYLVANIA WALKS - ANACONDA The Pennsylvania Walks ? Anaconda project is located in the community of Anaconda and consists of new 5-foot-wide sidewalks, an 8-foot-wide asphalt path, new curb and gutter, and replacement of two curb ramps. The new sidewalk will be on the west side of Sycamore St. extending from Park Ave. to Pennsylvania Ave. The sidewalk will continue east along Pennsylvania Ave., tying into an existing sidewalk and trail system at the first entrance on the left into Washoe Park. Roughly 1,100 ft east along Pennsylvania Ave. from the first entrance, the new 8-ft wide asphalt path will …
- Plans:
MT Deer Lodge|Powell County 2 District - SIGNALS - ANACONDA & DEER LODGE - 3 TIED (05C24)
- Bid Date:
- December 5, 2024
- Project Type(s)
- Description
- SIGNALS - ANACONDA & DEER LODGE - 3 TIED CMDP STWD(714) -The Signals - Anaconda & Deer Lodge project will upgrade traffic signals and pedestrian accessibility at the intersections of Park Avenue and Commercial Street with Main Street in Anaconda, and at the intersection of Main Street with Milwaukee Avenue in Deer Lodge. The proposed work includes removal and replacement of the existing traffic signals, installing new Accessible Pedestrian Signal (APS) push buttons and associated pedestrian countdown timers, reconstructing sidewalk corner pedestrian curb ramps, and new pavement markings and signage. STPS 275-1(13)0 - The Main Street - Deer Lodge project …
- Plans:
MT Garfield County 4 District - WEST OF JORDAN - WEST (04C24)
- Bid Date:
- December 5, 2024
- Project Type(s)
- Description
- WEST OF JORDAN - WEST This 8.8-mile project on MT 200 in Garfield County begins about 12 miles east of Sand Springs and continues northeast to about 12 miles west of Jordan. The project consists of major rehabilitation of existing pavement, widening the roadway form 28-ft. to 34-ft, sub-excavating selected sections, pulverizing the existing surface, and resurfacing the roadway. The scope also includes slope flattening, modified bridge ends, updated guardrail, pavement markings, seal and cover, and rumble strips.
- Plans:
MT Lake|Lincoln|Missoula|Sanders County 1 District - SF 209 MISSOULA NORTH SIGNS (02C24)
- Bid Date:
- December 5, 2024
- Project Type(s)
- Description
- SF 209 MISSOULA NORTH SIGNS The SF 209 Missoula North Signs project is to address identified crash trends in Flathead, Lake, Sanders, and Lincoln counties. The improvements are a varying combination of signing, flashers, variable message signs, curve signing, lighting, and delineation. Some work on this project is located within the boundaries of the Flathead Reservation.
- Plans:
MT Meagher County 2 District - WHITE SULPHER SPRINGS - SOUTH (01C24)
- Bid Date:
- December 5, 2024
- Project Type(s)
- Description
- WHITE SULPHER SPRINGS - SOUTH Mill and overlay, seal and cover, bridge deck crack seal, guardrail, rumble strips, pavement markings, delineation, and signing on the White Sulphur Springs-South project located in Meagher County. The project begins west of US-12/US-89 Junction (RP 33.1) and extends approximately 8.6 miles north along Primary Route 14 to W South St in White Sulphur Springs (RP 41.7).
- Plans:
Your local Metso Minerals Industries Inc dealer |
---|
Westate Machinery Co |
PacWest Machinery |
Loading...