Current Bids
10-06-25
AK SR District - Sitka Seawalk Phase II WFLHD RASPS AK SIT2017(1)- Cultural Resources Data Recovery Services (25263009A)
- Bid Date:
- October 6, 2025
- Project Type(s)
- Description
- Sitka Seawalk Phase II WFLHD RASPS AK SIT2017(1)- Cultural Resources Data Recovery Services The Consultant will engage the services of a Secretary of the interior's Professional Qualifications Standards for Cultural Resource Professionals to perform the activities necessary to provide information to the Department to help comply with section 106 of the National Historic Preservation Act (NHPA).
- Plans:
10-07-25
AK Aleutians East County SR District - COLD BAY TROUT CREEK CULVERTS WFL (SFHWY00326)
- Bid Date:
- October 7, 2025
- Project Type(s)
- Description
- COLD BAY TROUT CREEK CULVERTS WFL Project A: Replace two damaged culverts with new Aquatic Organism Passage structures across Trout Creek and Little Trout Creek in Cold Bay, AK. This option includes relocation of upstream channels, and installation of a new primary culvert. An overflow culvert is included in the bid schedule as Additive Alternate 1. Project B: Replace two damaged culverts with new Aquatic Organism Passage structures across Trout Creek and Little Trout Creek in Cold Bay, AK. This option includes the replacement of existing culverts in their current configuration.
- Plans:
AK Anchorage County CR District - Appraisal Review Services for AMATS: Northern Lights Blvd-Minnesota Dr to Seward Hwy Sidewalk (25262019)
- Bid Date:
- October 7, 2025
- Project Type(s)
- Description
- Appraisal Review Services for AMATS: Northern Lights Blvd-Minnesota Dr to Seward Hwy Sidewalk The Contractor shall provide appraisal review services for AMATS: Northern Lights Blvd-Minnesota Dr to Seward Hwy Sidewalk. The initial services in this contract will be for the south portion of the AMATS: N. Lights Blvd ? Minnesota Dr ? Seward Hwy Sidewalk replacement project (parent project 0001693 / CFHWY00713). This initial project work is known as AMATS: Northern Lights Blvd Sidewalk Repairs ? Phase 1 project, project numbers 0001823 / CFHWY01391. It is the Contracting Agency?s intention to add review appraisal services and related negotiated compensation for …
- Plans:
10-09-25
AK Denali Borough|North Slope|Northwest Arctic|Southeast Fairbanks County NR District - Northern Region Airport Electrical Maintenance 2025 (NR-MO-AEM-02)
- Bid Date:
- October 9, 2025
- Project Type(s)
AK Fairbanks North Star County NR District - FAST Area Surface Upgrades FFY2025 - Stage 2 (NFHWY01088)
- Bid Date:
- October 9, 2025
- Project Type(s)
- Description
- FAST Area Surface Upgrades FFY2025 - Stage 2 Perform pavement resurfacing, replace pavement markings, replace sidewalk curb with Americans with Disabilities Act (ADA) compliant curb ramps at street corners, improve sidewalks and pedestrian facilities, improve intersections, and install cross culverts on various streets and sidewalks in Fairbanks and North Pole.
- Plans:
Your local Volvo Construction Equipment dealer |
---|
PacWest Machinery |
AK Sitka County SR District - SIT SEAWALK PHASE II WFLHD RASPS (SFHWY00312)
- Bid Date:
- October 9, 2025
- Project Type(s)
MT Beaverhead|Madison|Silver Bow County 2 District - I-15 FENCING - MELROSE AREA (06R25)
- Bid Date:
- October 9, 2025
- Project Type(s)
- Description
- I-15 FENCING - MELROSE AREA This project is to replace R/W fencing along I-15 from the Glen interchange (RP 85.2) to the Soap Gulch Road overpass (RP 95.7) north of Melrose. Wildlife exclusion fencing will be installed from the Glen interchange to the Old Highway 91/RR crossing north of the Big Hole River to reduce vehicle-wildlife collisions, which is approximately 1.2 miles. The wildlife exclusion fencing will also include approximately 8 locations for wildlife jump outs.
- Plans:
MT Deer Lodge|Silver Bow County 2 District - BUTTE AREA STP STRUCTURES (02925)
- Bid Date:
- October 9, 2025
- Project Type(s)
- Description
- BUTTE AREA STP STRUCTURES The Butte Area STP Structures project includes bridge rehabilitation of four bridges consisting of bridge and approach rail replacement, crack sealing, superstructure replacement, deck and substructure concrete, and approach roadway work. The project is located at four locations: fishing access road bridge over Warm Springs Creek near I-90 Exit 201, Centennial Avenue bridge over BAPR, Shields Avenue bridge over BNSF, and Burlington Street bridge over I-90. This project is located in Silver Bow & Deer Lodge Counties.
- Plans:
MT Fergus County 5 District - ROY - WEST (06R22)
- Bid Date:
- October 9, 2025
- Project Type(s)
MT Garfield|McCone County 4 District - N OF FLOWING WELLS - NORTH & FLOWING WELLS - NORTH (MT-24) (04A23)
- Bid Date:
- October 9, 2025
- Project Type(s)
- Description
- N OF FLOWING WELLS - NORTH & FLOWING WELLS - NORTH (MT-24) N of Flowing Wells - North: Cold-in-place recycle, pavement overlay, signing, and pavement markings on the N of Flowing Wells - North project in McCone county. The project begins at RP 9.86 on P-42/MT and extends 9.86 miles north to RP 19.72. Flowing Wells - North (MT-24): Resurfacing, grading, cold recycled plant mix, guardrail, signing, and pavement markings on the Flowing Wells ? North (MT-24) project located in McCone and Garfield Counties. The project begins at the intersection of P-42 and N-57 and extends north toward Fort Peck.
- Plans:
Your local Superior dealer |
---|