Current Bids
07-09-25
AK Anchorage County CR District - Anchorage Highway Number FAU- Preserve (CFHWY00286)
- Bid Date:
- July 9, 2025
- Project Type(s)
AK Juneau County CR District - Juneau Highway Number None None (SPFAC00546)
- Bid Date:
- July 9, 2025
- Project Type(s)
- Description
- This state funded project will install a new single ply roofing membrane over the existing built-up roof assembly at the Juneau State Office Building (350 Main Street) in Juneau, Alaska. Work includes removal and replacement of existing metal copings, flashings, roof walkway protection pads, door thresholds, and roof accessories.
- Plans:
AK SR District - Highway Number None None (25253050)
- Bid Date:
- July 9, 2025
- Project Type(s)
- Description
- The Agreement?s purpose is to obtain design services for supporting replacement of the Hoadley Creek Bridge (BR. 725) located within the city of Ketchikan, Alaska. The services include: ? evaluating the project scope; ? designing necessary horizontal and vertical alignment modifications of the roadway; ? designing modifications to utilities (e.g. electrical, telecommunications, municipal water, and sanitary sewer); ? designing temporary traffic control for construction phasing and staging; ? updating the basemap survey of the roadway and adjacent features; ? public information and involvement; ? supporting environmental, right-of-way, utility, and construction processes; ? developing plans, specifications, and estimates at all project …
- Plans:
WA SNOHOMISH County - SNOHOMISH Highway Number 525 None (24A030)
- Bid Date:
- July 9, 2025
- Project Type(s)
- Description
- SR 525 SR 525 / I-405 I/C TO SR 99 VICINITY PAVING &ADA C
- Plans:
07-10-25
AK Fairbanks North Star County NR District - Fairbanks North Star Highway Number None None (NFHWY00913)
- Bid Date:
- July 10, 2025
- Project Type(s)
Your local Metso Minerals Industries Inc dealer |
---|
PacWest Machinery |
Westate Machinery Co |
07-11-25
AK Anchorage County CR District - Anchorage Highway Number None None (25252045)
- Bid Date:
- July 11, 2025
- Project Type(s)
- Description
- The Contractor shall provide professional services to support the development of an Airport Sustainability and Resilience Plan. This plan will address key challenges related to environmental sustainability, resilience to natural hazards, and long-term operational efficiency, in alignment with ANC's broader goals for future growth and climate adaptability.
- Plans:
07-15-25
AK Aleutians West County SR District - Aleutians West Highway Number None None (SFAPT00178)
- Bid Date:
- July 15, 2025
- Project Type(s)
- Description
- Begin preliminary design for the Unalaska airport apron and taxiway rehabilitation. For the terminal apron: mill 2 inches of the existing AC pavement and repair underlying PCC. Repave with 2 inches hot mix asphalt. For the hanger apron: repair PCC surface and joints and overlay with 2 inches of hot mix asphalt.
- Plans:
AK North Slope County NR District - North Slope Highway Number None None (NFHWY00947)
- Bid Date:
- July 15, 2025
- Project Type(s)
ID Canyon County - Canyon Highway Number None None (24106250515)
- Bid Date:
- July 15, 2025
- Project Type(s)
- Description
- For the work of repairing the Elijah Drain Culvert under SH-45 in Nampa
- Plans:
07-16-25
AK Kenai Peninsula County CR District - Kenai Peninsula Highway Number None None (25C0758505)
- Bid Date:
- July 16, 2025
- Project Type(s)
Your local Volvo Construction Equipment dealer |
---|
PacWest Machinery |
Loading...