Current Bids
08-04-26
AK CR District - TAP: Palmer-Fishhook Separated Pathway: Trunk Road to Edgerton Parks Road Culture Resource Services (25272010)
- Bid Date:
- August 4, 2026
- Project Type(s)
- Description
- TAP: Palmer-Fishhook Separated Pathway: Trunk Road to Edgerton Parks Road Culture Resource Services The TAP: Palmer-Fishhook Separated Pathway: Trunk Road to Edgerton Parks Road project will construct a separated, paved, non-motorized pathway from Trunk Road to Edgerton Parks Road. This project may also include: grading, culverts, including fish passage improvements, improved ditching, roadside hardware, utility relocation, vegetation clearing, landscaping, and signs. The Contractor shall provide Historic and Cultural Resources support for the project. Contractor services include: Historic and Cultural Resources and Initiation and Findings Letters. Contractor shall conduct a cultural resource investigation, including providing a cultural survey and determination of …
- Plans:
AK CR District - Continuing Alaska Aviation System Plan Phase IV (25272001)
- Bid Date:
- August 4, 2026
- Project Type(s)
- Description
- Continuing Alaska Aviation System Plan Phase IV The Alaska Department of Transportation & Public Facilities (DOT&PF) intends to issue an RFP for professional services with the objective of continuing the update of the Alaska Aviation System Plan (AASP). The primary purpose of the aviation system planning process is to examine the existing aviation system, update inventory information, analyze future trends and policy issues, and determine the type, extent, location, timing, and cost of airport development needs in the State of Alaska.
- Plans:
08-05-26
AK Bethel County CR District - Kwigillingok Airport Safety Improvements (CFAPT01479)
- Bid Date:
- August 5, 2026
- Project Type(s)
- Description
- Kwigillingok Airport Safety Improvements This federally funded project will rehabilitate and resurface the existing gravel runway, taxiway, and apron, and restore the runway to its previous length on the existing embankment. Additional work includes installing new threshold markers and applying dust palliative to runway, taxiway, and apron surfaces.
- Plans:
08-06-26
AK Kusilvak County NR District - Nunam Iqua Airport Improvements (NFAPT00368)
- Bid Date:
- August 6, 2026
- Project Type(s)
MT Carter County 4 District - MT-323 CULVERT - S OF EKALAKA (EX326)
- Bid Date:
- August 6, 2026
- Project Type(s)
- Description
- MT-323 CULVERT - S OF EKALAKA The MT-323 Culvert - S of Ekalaka project will replace a failing culvert approximately 23 miles south of Ekalaka in Carter County. The culvert is located along MT-323 (P-323) at RP 23.0 just south of the intersection with Secondary 328 (Tie Creek Road) in Catamount Creek.
- Plans:
MT Deer Lodge County 2 District - ANACONDA URBAN PAVE PRES (05826)
- Bid Date:
- August 6, 2026
- Project Type(s)
- Description
- ANACONDA URBAN PAVE PRES The Anaconda Urban Pave Pres project located in Deer Lodge County takes place on U-204 between RP 0.0 and RP 1.9 and U-206 between RP 0.0 and RP 0.5. Work on U-204 (4th Street/Van Buren Street) includes seal and cover, update ADA curb ramps, and update pavement markings. Proposed work on U-206 (7th Street) includes mill/fill, seal and cover, and update pavement markings and ADA curb ramps.
- Plans:
MT Gallatin County 2 District - BIG SKY - NORTH (04826)
- Bid Date:
- August 6, 2026
- Project Type(s)
- Description
- BIG SKY - NORTH The Big Sky - North project is a minor rehabilitation project to mill/overlay the roadway full width from RP 47.3 near Big Sky, north to RP 61.3 along US-191. . This project includes digouts, erosion repair, guardrail, seal & cover, rumble strips, pavement markings, and upgraded signing and delineation.
- Plans:
MT Lincoln County 1 District - LIBBY AREA BRIDGE DECKS (03826)
- Bid Date:
- August 6, 2026
- Project Type(s)
- Description
- LIBBY AREA BRIDGE DECKS The Libby Area Bridge Decks project is bridge deck rehabilitation to prolong the life of deck surfaces for six bridges in Lincoln County. MDT Structure IDs 05007, 05009, 05010, 05011, and 05012 are located on US-2 near Troy and Libby. MDT Structure ID 06932 is on S-567 north of Libby. Rehabilitation efforts include bridge deck concrete mill and overlay, PPC overlay, spall repair, expansion joint repair, bearing repair, roadway cold mill and PMS overlay, and pavement markings.
- Plans:
MT Mineral County 1 District - CYR INTERCHANGE STRUCTURE (02826)
- Bid Date:
- August 6, 2026
- Project Type(s)
- Description
- CYR INTERCHANGE STRUCTURE Bridge replacement across the Clark Fork River including grading and plant mix bituminous surfacing and crossovers on the Cyr Interchange Structure project in Mineral County, west of Alberton. The project is located on westbound I-90 from approximately RP 69.5 to 71.7. Work involves removing and replacing the existing westbound I-90 bridge over the Clark Fork River.
- Plans:
OR WASCO County 4 District - ALL ROADS TRANSPORTATION SAFETY (WASCO COUNTY) (15678)
- Bid Date:
- August 6, 2026
- Project Type(s)
- Description
- ALL ROADS TRANSPORTATION SAFETY (WASCO COUNTY)
- Plans:
| Your local Trimble Construction Division dealer |
|---|
| SITECH Northwest |
| SITECH Northwest |
| SITECH Northwest |
| SITECH Northwest |
| SITECH Northwest |
Loading...