Recently Updated Bids
01-05-22
AK Bethel County CR District - Bethel DPS Hangar and Office Improvements Design-Build REBID (2501000093-A)
- Bid Date:
- January 5, 2022
- Project Type(s)
- Description
- Bethel DPS Hangar and Office Improvements Design-Build REBID This state funded contract requires the Contractor to provide the necessary design and construction services to repair and replace deteriorating portions of the hangar and balance temperature throughout the office building at the Bethel Department of Public Safety. The Design-Builder may elect to provide up to three (3) Owner described enhancements as part of their proposal which will be scored as part of the proposal evaluation.
- Plans:
01-18-22
AK Kenai Peninsula County CR District - STERLING HIGHWAY MP 45-60 SUNRISE TO SKILAK LAKE RD RECONSTRUCTION CM/GC (Z530140000B)
- Bid Date:
- January 18, 2022
- Project Type(s)
- Description
- STERLING HIGHWAY MP 45-60 SUNRISE TO SKILAK LAKE RD RECONSTRUCTION CM/GC The State of Alaska Department of Transportation and Public Facilities (DOT&PF) invites proposals from general construction contractors to serve as "Construction Manager/General Contractor (CM/GC)" for the Sterling Highway MP 45-60 Sunrise to Skilak Lake Road Reconstruction project in Cooper Landing, Alaska.The CM/GC procurement is intended to encompass all materials, labor, supplies, equipment and supervision necessary for the complete construction of the project, including any preconstruction related services during the development process.
- Plans:
01-20-22
MT Flathead County 1 District - US-2 CULVERTS - SW OF MARION (EX521)
- Bid Date:
- January 20, 2022
- Project Type(s)
- GRADE & DRAIN
- Description
- US-2 CULVERTS - SW OF MARION Repair/replacement of 8 failing culverts that carry Kelly Creek or roadside drainage under US-2 on the US-2 Culverts-SW of Marion project located in Flathead County. In addition, the roadside slopes will be subexcavated, flattened, and reinforced with special borrow and high strength geotextile at RP 94.5 (about 0.2 miles west of Red Gate Road). The project begins approximately 2.4 miles east of McGregor Lane, at RP 93.1, and ends about 5.6 miles west of the town of Marion, at RP 95.0.
- Plans:
MT Granite|Missoula County 1 District - I-90 BRIDGE PRES MP 117-149, BONNER INTERCHANGE, & BEARMOUTH (03122)
- Bid Date:
- January 20, 2022
- Project Type(s)
- Bridge
- Description
- I-90 BRIDGE PRES MP 117-149, BONNER INTERCHANGE, & BEARMOUTH NHPB 90-2(159)117 This project is to rehabilitate eight bridges in District 1 between RP 117.07 and RP 148.03 on Interstate 90 (I-90) in Missoula and Granite County. Eight of the bridges carry I-90 and one is an overpass over I-90. The scope of work varies for each structure, but generally includes rehabilitation activities such as bridge deck milling and overlay work, bridge rail repairs or replacement, expansion joint replacement, guard angle removal, median barrier replacement, roadway approach work, guardrail replacement, barrier end repairs, substructure repair, and replacement of existing overhead signs. …
- Plans:
MT Lewis and Clark County 3 District - LINCOLN RD - MONTANA TO I-15 (01122)
- Bid Date:
- January 20, 2022
- Project Type(s)
- Safety
- Description
- LINCOLN RD - MONTANA TO I-15 The project is located in Lewis and Clark County approximately six miles north of Helena and includes improvements to the Lincoln Road and North Montana Avenue intersection, the Lincoln Road and southbound I-15 ramp, and the Lincoln Road and I-15 northbound ramp intersection. Work includes grade, gravel, PCCP surfacing, plant mix surfacing, curb and gutter, sidewalk, stormdrain, drainage, irrigation, electrical and other improvements including two single-lane roundabouts.
- Plans:
| Your local Trimble Construction Division dealer |
|---|
| SITECH Northwest |
MT Wibaux County 4 District - BEAVER CR - WIBAUX, 1 M S WIBAUX (04122)
- Bid Date:
- January 20, 2022
- Project Type(s)
- Bridge
- Description
- BEAVER CR - WIBAUX, 1 M S WIBAUX STPBIP-STPIP 27-3(23)78 - Replace 2 structures, grading, gravel, PMS overlay, sidewalk, curb/gutter and guardrail on the Beaver Creek-Wibaux 1 Mile S Wibaux project located in Wibaux County. The project is located at 2 sites along State Primary Route 27 between RP 78.1 to RP 78.7 and RP 80.1 to RP 80.4. HSIP-STPP 27-3(25)68 - Slope flattening, shoulder widening, replace structure with culvert, grading, gravel, PMS overlay, drainage, fencing and rumble strips on the SF 159 So Wibaux Curve Improvement project located in Wibaux County. The project begins at RP 67.5 and extends …
- Plans:
01-25-22
AK Statewide County M District - M/V Columbia Controllable Pitch Propeller System Replacement (SAMHS00147)
- Bid Date:
- January 25, 2022
- Project Type(s)
- Description
- M/V Columbia Controllable Pitch Propeller System Replacement Scope of work includes the installation of a new Controlled Pitch Propeller (CPP) System on the M/V Columbia, including Alarm and Monitoring systems installation, testing, and demonstration of acceptable operation to regulatory agencies and the owner. Work includes necessary remediation of contaminated materials, engineering, documentation, and State Funded annual overhaul work as outlined in the plans and specifications.
- Plans:
02-10-22
MT Beaverhead County 2 District - APEX - GLEN (08A21)
- Bid Date:
- February 10, 2022
- Project Type(s)
- Pavement Preservation
- Description
- APEX - GLEN Crack seal, seal and cover, digouts, bridge repair, and safety improvements on the Apex - Glen project located in Beaverhead County. The project is located along Interstate 15 from south of the Apex Interchange at RP 74.5 and extends north for approximately 10.3 miles to south of the Glen Interchange at RP 84.8.
- Plans:
MT Big Horn County 5 District - HARDIN - EAST (S-384) & WYOLA SAFETY IMPROVEMENT (2 TIED) (03222)
- Bid Date:
- February 10, 2022
- Project Type(s)
- Safety
- Description
- HARDIN - EAST (S-384) & WYOLA SAFETY IMPROVEMENT (2 TIED) STPS 384-1(24)1 - Seal & cover, pavement markings, and minor bridge rehabilitation on the Hardin East (S-384) project located within the county of Bighorn. The project begins at RP 1.17 and extends northeast along Sarpy Road to RP 12.66. This project is located on the Crow Indian Reservation. HSIP 90-9(146)540 - Installation of Signs, delineation, and safety improvements on the I-90 Wyola Safety Improvements project located within the county of Bighorn. The project begins at RP 540.40 and extends south to RP 546.60 along Interstate 90. This project is located …
- Plans:
MT Big Horn County 5 District - BUSBY-EAST & WEST (19A21)
- Bid Date:
- February 10, 2022
- Project Type(s)
- GRADE & DRAIN
- Description
- BUSBY-EAST & WEST Grading, gravel, cold milling, crack seal, PMS overlay, digouts, guardrail, rumble strips, and pavement markings on the Busby-East & West project located in Big Horn County. The project begins at RP 22.19 and extends approximately 5.0 miles along National Highway Route 37/US 212 to RP 27.15. The entire project is located within the Northern Cheyenne Indian Reservation.
- Plans:
| Your local Metso Minerals Industries Inc dealer |
|---|
| PacWest Machinery |
| Westate Machinery Co |
Loading...