Recently Updated Bids
05-20-26
AK Anchorage County - The Contractor shall provide surveying and mapping services in support of the design of this project (25262010)
- Bid Date:
- May 20, 2026
- Project Type(s)
05-29-26
AK - The Contractor shall provide right of way appraisal, acquisition, and relocation services for the above named project in accordance with the Uniform Relocation and Real Property Acquisition Act, as re (25262021)
- Bid Date:
- May 29, 2026
- Project Type(s)
- Description
- The Contractor shall provide right of way appraisal, acquisition, and relocation services for the above named project in accordance with the Uniform Relocation and Real Property Acquisition Act, as required in 49 CFR Part 24, and the Department?s Right of Way Manual. The Contracting Agency reserves the right to add or delete parcels as needed.
- Plans:
06-03-26
WA PIERCE THURSTON County - I-5 N OF MARTIN WAY E TO E OF MOUNTS RD SW PCCP REPLACEMENT 25C513 ADDENDA NO (25C513)
- Bid Date:
- June 3, 2026
- Project Type(s)
06-04-26
MT Garfield, McCone, Roosevelt, Valley County - crack sealing approximately 45 miles along three separate sites in the northern half of the Glendive District (02626)
- Bid Date:
- June 4, 2026
- Project Type(s)
- Description
- The D4 Crack Seal - North project consists of crack sealing approximately 45 miles along three separate sites in the northern half of the Glendive District. The first section is in Valley County along MT-24 beginning on the northern boundary of the Fort Peck Reservation at RP 33.0 and extending north for just over 16 miles ending at RP 50.4 in Opheim. The second section is in Roosevelt and McCone Counties along MT-13 beginning 4 miles south of Vida at RP 26.2 and extending north for nearly 21 miles ending at RP 47.1 at the intersection of MT-13 and MT-25 …
- Plans:
MT Hill County - The project will repair flood damage and provide long-term drainage facilities on the north side of US-2 adjacent to Big Sandy Creek, approximately three miles west of Havre in Hill County (01626)
- Bid Date:
- June 4, 2026
- Project Type(s)
- Description
- The project will repair flood damage and provide long-term drainage facilities on the north side of US-2 adjacent to Big Sandy Creek, approximately three miles west of Havre in Hill County. The project extends from RP 375.9 to RP 376.3. Work includes re-grading the roadside ditch on the north side of US-2 with a new outfall to Big Sandy Creek and two new approaches on the north side of US-2.
- Plans:
06-11-26
AK Juneau County - ER mitigation and response to the expected damage caused by a glacial lake outburst flooding (GLOF) from Suicide Basin at the Mendenhall Glacier (SDRER00659-2)
- Bid Date:
- June 11, 2026
- Project Type(s)
- Description
- ER mitigation and response to the expected damage caused by a glacial lake outburst flooding (GLOF) from Suicide Basin at the Mendenhall Glacier. This project is "Stage 2" of the emergency response effort, to repair rock armor on the North riverbank & bridge abutment slope at Mendenhall River Bridge (BN 0217).
- Plans:
06-24-26
AK Statewide County - Professional services for In-state Field Welding and Coating Inspection, Sampling, and Testing within the State of Alaska; to include in-state fabrication inspection (25261033)
- Bid Date:
- June 24, 2026
- Project Type(s)
- Description
- Professional services for In-state Field Welding and Coating Inspection, Sampling, and Testing within the State of Alaska; to include in-state fabrication inspection. This contract will provide services for ADOT&PF Northern, Central, and Southcoast Region Project Managers as well as Bridge Design, Public Facilities and Marine Highway.
- Plans:
WA THURSTON County - SR 510 YELM LOOP NEW ALIGNMENT PHASE 2 22C517 ADDENDA NO (22C517)
- Bid Date:
- June 24, 2026
- Project Type(s)
- Description
- SR 510 YELM LOOP NEW ALIGNMENT PHASE 2 22C517 ADDENDA NO. 3
- Plans:
06-25-26
| Your local Trimble Construction Division dealer |
|---|
| SITECH Northwest |
| SITECH Northwest |
| SITECH Northwest |
| SITECH Northwest |
Loading...