Recently Updated Bids
11-14-24
MT Flathead County 1 District - US 93 & TREELINE ROAD (KAL) (09B24)
- Bid Date:
- November 14, 2024
- Project Type(s)
- Description
- US 93 & TREELINE ROAD (KAL) The project is located at the intersection of US Hwy 93 and Treeline Road in Kalispell, located in Flathead County. The project will improve the intersection operation and upgrade pedestrian and ADA accessibility and align the exclusive left turn lanes across the intersection on Treeline Road. Sidewalks and ramps will be upgraded.
- Plans:
MT Glacier County 3 District - NYHAGEN RD PATH - CUT BANK (06B24)
- Bid Date:
- November 14, 2024
- Project Type(s)
- Description
- NYHAGEN RD PATH - CUT BANK This project is to construct an ADA/PROWAG compliant path from the existing Anna Jeffries Path near Highway 213 to the east where a new crosswalk will be constructed across Central Ave. The path continues to the east along the south side of Nyhagen Road. East of 6th Avenue NE a concrete sidewalk of approximately 1,100 feet is being constructed to stay within existing right-of-way. After the concrete sidewalk the plant mix path resumes to the east where it turns to the south just west of the access road on the west side of the …
- Plans:
MT Granite|Mineral|Missoula County 1 District - D1 GUARDRAIL & FENCING (I-90) (04B24)
- Bid Date:
- November 14, 2024
- Project Type(s)
- Description
- D1 GUARDRAIL & FENCING (I-90) Roadway & roadside safety improvements on the D1 Guardrail & Fencing (I-90) project on I-90 located in three sections within the MDT Missoula District: ? The first section begins in Mineral County approximately two (2) miles west of Haugan at RP 14.6 and extends 59.2 miles east to approximately two (2) miles west of Alberton at RP 73.8. ? The second section begins in Missoula County approximately 1.9 miles west of the Clinton interchange at RP 118.8 and extends 5.7 miles east to approximately 1.5 miles west of the Rock Creek interchange at RP 124.5. …
- Plans:
MT Missoula County 1 District - GREENOUGH HILL - NORTH (01B24)
- Bid Date:
- November 14, 2024
- Project Type(s)
- Description
- GREENOUGH HILL - NORTH Cold milling, plant mix surfacing, seal & cover, fog seal, guardrail upgrades, rumble strips, new signing and pavement markings on the Greenough Hill-North project located in Missoula County. The project begins at RP 22.7 west of the Lubrecht Forest approach and extends approximately 4.0 miles along Principal Arterial Route N-24 (MT-200) to RP 26.7.
- Plans:
11-20-24
AK Bethel County CR District - Nightmute Airport Improvements (CFAPT00572)
- Bid Date:
- November 20, 2024
- Project Type(s)
- Description
- Nightmute Airport Improvements This federally funded project will rehabilitate the runway, taxiway, runway and taxiway safety areas, apron, and airport access road at the Nightmute Airport in Nightmute, Alaska. Improvements will also include expanding the runway safety area; reconstructing the runway and taxiway lighting systems; installing a new rotating beacon on a tip-down pole; improvements to the electrical equipment building; installing new lighted primary and supplemental wind cones; re-leveling a snow removal equipment building; drainage improvements; and construction of a riprap revetment and permanent barge landing.
- Plans:
Your local Trimble Construction Division dealer |
---|
SITECH Northwest |
11-21-24
AK Haines County SR District - HNS HWY RECONSTRUCTION MILEPOST 20-25.0 (Z686060000)
- Bid Date:
- November 21, 2024
- Project Type(s)
12-04-24
AK NR District - Term Agreement for Statewide Communication Support Services 2025 (25251004)
- Bid Date:
- December 4, 2024
- Project Type(s)
- Description
- Term Agreement for Statewide Communication Support Services 2025 Professional services to provide formatted media on an as-needed basis for various internal and external communications purposes. Examples of deliverables include original content creation or editing of data (infographics/charts), figures, fliers, brochures, reports, presentations, website content, videos, and GIS mapping.
- Plans:
12-05-24
AK Matanuska-Susitna County NR District - Knik Arm Tunnel Feasibility Study (25251013)
- Bid Date:
- December 5, 2024
- Project Type(s)
- Description
- Knik Arm Tunnel Feasibility Study
- Plans:
MT Beaverhead|Deer Lodge|Gallatin|Jefferson County 2 District - SF 209 BUTTE DIST SIGNS (03C24)
- Bid Date:
- December 5, 2024
- Project Type(s)
- Description
- SF 209 BUTTE DIST SIGNS Description. The SF 209 Butte District Signs project includes signing, roadside and barrier rail delineation, pavement markings, radar activated solar warning beacon, radar activated solar LED curve signs, and scale site signing/electrical at 29 sites within the Butte District. Sites include 1 through 23, and Sites 25 through 30. Work at Site 24 will be performed by others and is shown for information only. Work sites are within Beaverhead, Deer Lodge, Lewis & Clark, Gallatin, Jefferson, Madison, Park, Powell, and Silver Bow counties. Locations include the following: Site 1- US-212 RP 0.000 to RP 8.550 …
- Plans:
MT Deer Lodge County 2 District - PENNSYLVANIA WALKS - ANACONDA (06C24)
- Bid Date:
- December 5, 2024
- Project Type(s)
- Description
- PENNSYLVANIA WALKS - ANACONDA The Pennsylvania Walks ? Anaconda project is located in the community of Anaconda and consists of new 5-foot-wide sidewalks, an 8-foot-wide asphalt path, new curb and gutter, and replacement of two curb ramps. The new sidewalk will be on the west side of Sycamore St. extending from Park Ave. to Pennsylvania Ave. The sidewalk will continue east along Pennsylvania Ave., tying into an existing sidewalk and trail system at the first entrance on the left into Washoe Park. Roughly 1,100 ft east along Pennsylvania Ave. from the first entrance, the new 8-ft wide asphalt path will …
- Plans: