PR I-70 GWC MATERIAL FLOWS 2021
ID - C24767
ID - C24767
Location: CO GARFIELD|EAGLE County 3110 District
Bid Date/Time: May 6, 2022, 10 a.m.
Project Type:
Safety
Status: Initial
Description:
PR I-70 GWC MATERIAL FLOWS 2021 THIS PROJECT IS LOCATED ALONG I-70 BETWEEN MP 116-133, THRU GLENWOOD CANYON, IN GARFIELD AND EAGLE COUNTIES.THIS IS AN PERMANENT REPAIR PROJECT INTENDED TO IMPROVE THE RESILIENCY OF I-70 BY PREEMPTIVELY INSTALLING MITIGATION MEASURES TO PREVENT I-70 DAMAGE AND IMPROVE SAETY DURING FUTURE MATERIAL AND DEBRIS FLOWS. THE WORK INCLUDES BUT IS NOT LIMITED TO, DEBRIS BARRIERS, GABION WALLS, EARTHWORK, CULVERT PROTECTION, MULCHING WOOD STRAND, SEEDING AND TRAFFIC CONTROL. A MANDATORY PRE-BID MEETING WILL BE HELD VIRTUALLY ON FRIDAY, APRIL 29, 2022 AT 10:00AM.THIS MEETING CAN BE ACCESSED AT: https://meet.google.com/ijb-yuvx-mjd OR BY PHONE AT: (US) + 1 402-824-0251 PIN: 515 703 430#
PR I-70 GWC MATERIAL FLOWS 2021 THIS PROJECT IS LOCATED ALONG I-70 BETWEEN MP 116-133, THRU GLENWOOD CANYON, IN GARFIELD AND EAGLE COUNTIES.THIS IS AN PERMANENT REPAIR PROJECT INTENDED TO IMPROVE THE RESILIENCY OF I-70 BY PREEMPTIVELY INSTALLING MITIGATION MEASURES TO PREVENT I-70 DAMAGE AND IMPROVE SAETY DURING FUTURE MATERIAL AND DEBRIS FLOWS. THE WORK INCLUDES BUT IS NOT LIMITED TO, DEBRIS BARRIERS, GABION WALLS, EARTHWORK, CULVERT PROTECTION, MULCHING WOOD STRAND, SEEDING AND TRAFFIC CONTROL. A MANDATORY PRE-BID MEETING WILL BE HELD VIRTUALLY ON FRIDAY, APRIL 29, 2022 AT 10:00AM.THIS MEETING CAN BE ACCESSED AT: https://meet.google.com/ijb-yuvx-mjd OR BY PHONE AT: (US) + 1 402-824-0251 PIN: 515 703 430#
Project Roles
Owners
- Owner COLORADO DEPARTMENT OF TRANSPORTATION, 400 SOUTH COLORADO BLVD DENVER CO 80204
| Your local Trimble Construction Division dealer |
|---|
| SITECH Northwest |