I-70 DOWD CANYON VSL MP 169-173
ID - C24015
ID - C24015
Location: CO EAGLE County 3800 District
Bid Date/Time: May 11, 2023, 10 a.m.
Project Type:
Safety
Status: Awarded
Description:
I-70 DOWD CANYON VSL MP 169-173 I-70 DOWD CANYON MP 169-173 EAGLE COUNTY Installation of 18 variable speed limit signs, one roadway weather information system, 7 MVRDs, bored and trenched electrical conduit for fiber and electric, 85 pullboxes, wiring, fiber, guardrail and end anchors, and erosion control.
I-70 DOWD CANYON VSL MP 169-173 I-70 DOWD CANYON MP 169-173 EAGLE COUNTY Installation of 18 variable speed limit signs, one roadway weather information system, 7 MVRDs, bored and trenched electrical conduit for fiber and electric, 85 pullboxes, wiring, fiber, guardrail and end anchors, and erosion control.
Project Roles
Owners
- Owner COLORADO DEPARTMENT OF TRANSPORTATION, 400 SOUTH COLORADO BLVD DENVER CO 80204
Bidders
- Bidder MORTON ELECTRIC, INC., - $7,789,750, 1049 MEADOW LANE CO 81006 (719)948-3097 CO 81006
- Bidder LUMIN8 TRANSPORTATION TECHNOLOGIES, LLC, - $4,956,044, 5920 LAMAR STREET ARVADA CO 80003
- Bidder STURGEON ELECTRIC COMPANY, INN CERT, - $6,099,999, 12150 E. 112TH AVE. CO 80640 (303)286-8000 CO 80640
Apparent Low Bidder: LUMIN8 TRANSPORTATION TECHNOLOGIES, LLC
| Your local Trimble Construction Division dealer |
|---|
| SITECH Northwest |