GLASTONBURY, CT — STV announces the Connecticut Department of Transportation (CTDOT) selected the firm to provide construction engineering and inspection (CEI) services at the Route 17 and New London Turnpike interchange in Glastonbury, Connecticut.
The project will address vital operational, safety, and structural needs at the interchange including:
- Removal of two aging bridges
- Full bridge deck replacement
- Elimination of the at-grade Route 17 southbound off-ramp
- 400 feet of lane widening along Oak Street and reconfiguration of its intersection with New London Turnpike
- Full replacement of all traffic signal equipment with new span poles utilizing video and radar detection systems
- Pedestrian improvements throughout the project area
- Installation of new overhead signs along Route 17 northbound
The centerpiece of the project involves construction of a new roundabout at the intersection of New London Turnpike and Route 17 southbound ramps near Douglas Road. The roundabout will feature a distinctive 20-foot stamped asphalt apron along with additional pedestrian safety elements carefully integrated into the design.
“Our longstanding partnership with CTDOT, paired with the passion and expertise of our team, allows us to deliver projects that truly make a difference,” said David Breza, PE, Vice President and Connecticut Area Manager at STV. “Making communities better is what drives us at STV, so we are proud to support making travel safer, smoother, and more reliable for everyone who depends on this corridor.”