New England Construction

Dedicated to the people who make our built environment better and safer. We tell your stories and celebrate your successes.

Register with us and receive industry news and content only available to subscribers.

Subscribe
Contacts

Indianapolis, IN, USA (HQ)

903 E. Ohio St., Indianapolis, IN 46202

Call: (317) 423-2325

info@acppubs.com
April 2026

Doka Presents First Formwork Sheet with Recycled Plastic

Doka unveiled Xlife top, the industry’s first formwork sheet engineered with a core made with 100 percent recycled plastic, at CONEXPO-CON/AGG 2026. Designed for durability and multiple reuse cycles, each Xlife top sheet can be returned to Doka at the end of its life and reprocessed into new sheet cores, dramatically reducing waste and long-term material costs.

“Xlife top represents a fundamental shift in how formwork materials are designed, used, and brought back into the material cycle,” said Michael Kennedy, Executive Vice President of Doka Americas and CEO of Doka USA. “Reducing greenhouse gas emissions on construction sites requires more than ambition; it requires smart product design. Xlife top is the result of our commitment to material innovation, modularity, and refurbishment to extend the lifespan of every formwork component.”

Xlife top sheets are designed for seamless integration with Doka framed formwork systems.

According to Doka, the silk-matte, scratch-resistant surface of Xlife top produces smooth, uniform finishes without the staining or surface imperfections that are common with phenolic resin sheets. The sheet installs flush within the panel to deliver a clean finish from the first pour.

Xlife top’s composite structure also resists damage, extending its lifespan beyond conventional formwork sheets. Crews can clean the surface quickly, even with high-pressure washers. Doka also offers enhanced refurbishment options, including partial sheet replacement, for lower maintenance and reconditioning costs.

Develon
Your local Hyundai dealer
Equipment East

Digital Integration

In addition, Doka announced the U.S. launch of Doka 360, an integrated digital customer platform designed to connect and streamline every step of the formwork process.

On many job sites, formwork orders are placed by phone; material availability is estimated by hand; and critical data lives in emails, spreadsheets, and paper. Returns require another round of phone calls, and planning happens across a patchwork of unconnected apps. Doka 360 brings each step of the formwork process into an integrated digital platform.

“Doka 360 represents our ongoing commitment to digital transformation in construction and practical innovations that solve real-world challenges on the job site,” Kennedy said. “With Doka 360, we’re helping customers replace outdated methods and tools with a unified, digital experience that puts every piece of critical information, from material availability to delivery tracking, right at their fingertips for faster, safer, and more productive job sites.”

Wirtgen America Inc
Your local Wirtgen America dealer
United Construction & Forestry
WI Clark
Wirtgen America Inc
Your local Wirtgen America dealer
United Construction & Forestry
WI Clark
SITECH
Your local Trimble Construction Division dealer
SITECH Northeast