Today's infrastructure projects are not just larger. They are more constrained, more technical, and less forgiving. Work often takes place in tighter footprints, with limited access, more complex reinforcement, and stricter safety controls, all of which place greater demands on sequencing and how work is carried out.
In this environment, …
by: John DiMicco, Northeast Area Manager at Doka USA
Joint Venture Tackles Massachusetts DOT’s Largest Design-Build Project to Date
In response to years of mounting congestion and safety concerns, the Massachusetts Department of Transportation (MassDOT) is in the midst …
by: Keith Loria
Gale Associates Boosts Retention with Wage Equity, Career Pathways, and Flexibility
With employee turnover rising, Gale Associates, Inc., a consulting engineering firm headquartered in Rockland, Massachusetts, sought to understand the …
by: Julie Devine- StateProject Awards
- CTHartford - Replace Noise Barrier/Guiderail on Route 72 EB between CT 555 & 3723,397,528Atlas Industrial Services, LLC.
- MADistrict 4 - Scheduled & Emergency Drainage Repairs and Improvements at Various Locations [DISTRICT 4 ] 7/17/2026 2:37:43 PM1,032,266J TROPEANO INC
- MADistrict 3 - Guide and Traffic Sign Replacement on a Section of Route 2 [ACTON -CONCORD -HARVARD -LITTLETON ] 7/17/2026 11:39:43 AM1,579,762ROADSAFE TRAFFIC SYSTEMS INC
- MEPENOBSCOT - 27194.00 ORONO LARGE CULVERT REPLACEMENT996,365SARGENT CORPORATION
- MEPENOBSCOT - ETNA LARGE CULVERT REPLACEMENT713,554SARGENT CORPORATION
| Your local Hyundai dealer |
|---|
| Equipment East |
| Equipment East |
| Equipment East |
| Equipment East |
| Your local Volvo Construction Equipment dealer |
|---|
| Tyler Equipment |
| Tyler Equipment |
| Tyler Equipment |
| Tyler Equipment |
| Your local Trimble Construction Division dealer |
|---|
| SITECH Northeast |
| SITECH Northeast |
| SITECH Northeast |
| SITECH Northeast |













































