Construction News

Dedicated to the people who make our built environment better and safer. We tell your stories and celebrate your successes.

Register with us and receive industry news and content only available to subscribers.

Subscribe
Contacts

Indianapolis, IN, USA (HQ)

903 E. Ohio St., Indianapolis, IN 46202

Call: (317) 423-2325

info@acppubs.com

Louisiana Governor, DOTD Announce the Opening of the New I-10 West Flyover Ramp to MSY

BATON ROUGE, LA — Gov. John Bel Edwards and the Louisiana Department of Transportation and Development (DOTD) announce that the newly constructed I-10 west flyover ramp to the Louis Armstrong New Orleans International Airport at Loyola Drive in Kenner officially opened to traffic.

The opening of the new ramp marks the first significant step toward the completion of the $125.6 million I-10/Loyola Drive Interchange Project, ongoing since 2020, which improves interstate, local, and airport traffic flow through the Kenner area.

“We are excited about this great news, which is a testament to our continued commitment to improving Louisiana’s infrastructure that will provide pivotal access to thousands of people every single day,” Edwards said. “I remember when we had the groundbreaking ceremony for this project in late 2019 and the excitement from the community and all the travelers who use this corridor. Construction began in early 2020, and here we are today with a new ramp that will provide travelers easy access to the recently constructed state-of-the-art Louis Armstrong New Orleans International Airport terminal by passing over the Loyola/Veterans Boulevard intersection, dropping drivers right onto Terminal Drive. We’ve completed the first ramp, and we are looking forward to opening the second ramp in the near future.”

The next major step in the project's opening will be the second flyover ramp, which will allow exiting airport vehicles to merge directly onto I-10 east toward New Orleans. This second flyover ramp, adjacent to the first, is estimated to open in approximately two weeks, weather permitting.

Opening both ramps will dramatically increase traffic flow efficiency in and out of the airport and ease congestion off the Loyola Drive exit. The Loyola Drive exit has served as the main entryway to the new airport since the new airport opened in 2019.

Takeuchi Mfg Ltd
Your local Takeuchi Mfg Ltd dealer
Kirby Smith Machinery
Power Equipment Co

Newly constructed auxiliary lanes join I-10 between the Williams Boulevard (LA 49) and Loyola Drive exits. These extra lanes widen I-10 to four lanes in each direction, thus easing congestion and allowing airport traffic to have less of an impact on interstate traffic.

Gomaco
Your local Gomaco dealer
Clark Machinery
Gomaco
Your local Gomaco dealer
Clark Machinery
SITECH
Your local Trimble Construction Division dealer
SITECH Tri-Rivers