Construction

Dedicated to the people who make our built environment better and safer. We tell your stories and celebrate your successes.

Register with us and receive industry news and content only available to subscribers.

Subscribe
Contacts

Indianapolis, IN, USA (HQ)

903 E. Ohio St., Indianapolis, IN 46202

Call: (317) 423-2325

info@acppubs.com
November 2026

Zachry Construction Selected for Major Catawba River Bridge Replacement in North Carolina

CHARLOTTE, NC — The North Carolina Department of Transportation selects Zachry Construction Corporation as prime contractor for the U.S. 29/U.S. 74 Bridge Replacement over the Catawba River and N.C. 7 at U.S. 74 project.

The project will help strengthen a critical transportation connection between Gaston and Mecklenburg counties in North Carolina, improving mobility and supporting the corridor’s long-term needs. Substantial completion is planned for April 2031.

Wilkinson Boulevard/U.S. 29-74 serves as a key regional corridor for residents, businesses, and travelers. The work will replace the existing Catawba River bridge with a larger six-lane structure designed to improve capacity and reliability, including when traffic diverts from Interstate 85 during emergencies.

Improvements extend beyond the river crossing. At N.C. 7/Catawba Street, a reduced-conflict intersection will better accommodate traffic volumes and address recurring backups. New multi-use paths will create additional connections to Gaston College, Kevin Loftin Riverfront Park, the ISWA Nature Preserve, and proposed Belmont greenway connections, supporting mobility for drivers, pedestrians, and cyclists.

Zachry’s scope includes grading, drainage, paving, signals, utility work, erosion control, traffic control, and structures. The new Catawba River bridge will incorporate drilled piers, steel piles, prestressed concrete girders, a reinforced concrete deck, barrier rail, lighting and utility conduit, bridge coatings, and architectural treatments.

Topcon Construction Products
Your local Topcon Positioning Systems Inc dealer
Linder Industrial Machinery

“Complex bridge work demands more than technical capability. It requires detailed planning, disciplined execution, and a clear understanding of how each phase affects the broader project and traffic flow throughout the surrounding community,” said Kevin Allen, Vice President and Southeast Regional Manager for Zachry Construction Corporation. “Our experience delivering signature bridge and highway programs provides a strong foundation for this work and a clear understanding of how important it is to maintain mobility while building critical infrastructure that communities will rely on for decades."

Komatsu Dealer Program
Your local Komatsu America Corp dealer
Linder Industrial Machinery
Komatsu Dealer Program
Your local Komatsu America Corp dealer
Linder Industrial Machinery
SITECH
Your local Trimble Construction Division dealer
SITECH Mid-South