Fricke Rejoins HNTB as Project Director in Southern California
“Mark brings extensive experience with complex client projects throughout Southern California and has in depth understanding of Caltrans and local agency requirements and procedures,” said Wayne Feuerborn, HNTB West Division President. “We are pleased to welcome Mark back to the HNTB team.”
He previously worked at HNTB from 1984 to 2002 on a range of transportation projects throughout California. Fricke has experience as both an Engineer and Manager on a diverse range of projects. He has a track record of providing preliminary and final design of roadway and geometric plans for major urban corridor improvements on a fast-track basis.
Most recently, Fricke worked as Roadway Design Manager for the Los Angeles County Metropolitan Transportation Authority on Interstate 5 HOV Improvements in North County and Soundwall Package 11 along State Route 170 and Interstate 405; and as Roadway Design Manager for the Orange County Transportation Authority on the State Route 57 Northbound Widening project. All three projects required design coordination with Caltrans.
Fricke earned a Bachelor of Science in civil engineering at Metropolitan State University in Denver, Colorado. He is a registered Professional Engineer in California.
Currently, HNTB is working on the I-10 Corridor Project Phase 1 with the San Bernardino County Transportation Authority; the I-405 Improvement Project for the Orange County Transportation Authority; and the Sepulveda Transit Corridor Project Feasibility Study for the Los Angeles County Metropolitan Transportation Authority.