SACRAMENTO, CA — Clark Pacific, a provider of prefabricated systems for building design and construction, announces the groundbreaking of a new 663-stall parking structure on the University of California, Berkeley campus. The project will replace the aging one-story Bancroft parking structure with a modern, seismically resilient and sustainable parking upgrade for faculty, staff, and visitors.
As the architect of record, manufacturer, and general contractor, Clark Pacific is a single-source provider. Working with a single source provides UC Berkeley with the cost certainty and efficiency benefits of prefabrication, as well as the simplicity of a consolidated project team, resulting in accelerated project delivery. This project is one of several that Clark Pacific has completed on the University of California, Berkeley campus.
"The new Bancroft Parking Structure represents a significant investment in our campus infrastructure, providing essential parking capacity while prioritizing safety, convenience, and sustainability," said Seamus Wilmot, Assistant Vice Chancellor and Executive Director of Business Operations at UC Berkeley. "Clark Pacific's integrated approach, longstanding partnership with the university, and expertise have been invaluable throughout the design and planning phases, and we look forward to continuing the collaboration as we move into construction."
Clark Pacific collaborated closely with the university throughout the design process, ensuring that the structure integrates with the campus environment and aligns with the institution's long-term strategic goals. The parking structure is engineered for seismic resilience, utilizing Clark Pacific's Precast Hybrid Moment Frame system. This structural solution offers enhanced ductile behavior and energy dissipation during seismic events, aligning with the stringent seismic safety requirements of the University of California, Berkeley.
The parking structure is designed to achieve LEED Silver certification, with a clear roadmap to achieving Gold. It also features provisions for a fully operational photovoltaic system and is equipped with 72 electric vehicle charging stalls on day one, with an additional 66 to be added as demand increases.
Your local Trimble Construction Division dealer |
---|
SITECH Southwest |
SITECH West |
"We are thrilled to break ground on the new Bancroft Parking Structure and continue our work with UC Berkeley," said Robert Clark, Co-CEO of Clark Pacific. "This project is a testament to UC Berkeley's forward-thinking approach and focus on seeking out construction methods, solutions, and partners that deliver value, increase safety, and set a new standard for environmentally conscious campus development. We're looking forward to providing UC Berkeley with a high-quality, future-ready parking structure that meets their evolving needs and the highest standards of safety and sustainability."
The project is slated for completion in August 2026.