SEATTLE, WA — HOK, Hensel Phelps, and the Port of Seattle are wrapping up a portion of updates on Seattle-Tacoma International Airport’s North Main Terminal for Alaska Airlines. As part of the SEA Gateway Project, the work includes a new bridge-level check-in space for travelers with automated baggage tagging and drop off stations. Alaska Airlines is rolling out this new automated baggage system at their hub airports in North America.
“The SEA Gateway Project exemplifies our commitment to creating inspiring and efficient spaces for travelers,” said Todd Buchanan, HOK’s Principal-in-Charge on the project. “This milestone reflects the incredible teamwork and dedication of everyone involved, ensuring that travelers can enjoy a seamless experience.”
The overall project will modernize the airport, accommodate increased passenger demand, and transform the terminal for today’s and tomorrow’s travelers. It includes a refreshed lobby and check-in area, updated baggage handling services, building system and technology upgrades, office and tenant space reconfigurations, an expanded security checkpoint, and accessibility improvements at baggage-claim-level entrances.
HOK’s design for the expansive new lobby creates a space filled with daylight. The materials selected reflect the Pacific Northwest’s landscape. Spacious lobby and check-in areas combined with digital wayfinding enhance the traveler experience.
The design-build team is also collaborating with artists to incorporate a variety of installations throughout the upgraded terminal, including a suspended sculpture and a 60-foot digital art display in the ticketing lobby.
Your local Gomaco dealer |
---|
American Construction Supply |
Tri-State Truck & Equipment Inc |
Focused on sustainability, the airport modernization is targeting LEED Silver certification. The renovated North Main Terminal is set to be fully operational by 2026.