The 194,000-square-foot facility — located in Rancho Cordova, California — will include various work modes that support both open environment work areas as well as private areas, including one-on-one rooms, team collaborative spaces, and hospitality-like café and coffee areas that promote casual meetups. Stantec’s national workplace team recently sponsored a research project to identify the impact biophilic design has on holistic well-being with Harvard University, directly measuring physiological, emotional, and cognitive wellness. The study results, reflected in the design, show that leveraging these patterns of biophilia can positively impact well-being.
The space is designed to be bright, airy, and open, with natural light throughout. The building’s newly designed front entrance will evoke a natural environment in support of well-being, and the facility will provide ease of accessibility via nearby bike trails and bike parking. The building is designed in support of LEED Gold and University of California Carbon Neutrality guidelines.
“We’re thrilled to see this space commence construction, in partnership with UC Davis Health and XL Construction,” said Brian Crilly, Stantec Architect and Project Manager. “In today’s environment, we understand the importance of feeling inspired by your workspace when returning to the office. We designed this space to do exactly that: inspire UC Davis’ team members, while supporting their performance and holistic well-being.”
“The working synergy between UC Davis, the City of Rancho Cordova, Stantec, XL and all the design partners on this fast-moving project are very inspiring,” said Craig Jamison, Healthcare Project Executive with XL Construction. “Together, we are pushing the boundaries on the sustainability front with aggressive energy use intensity goals and innovative energy-saving features. For example, we’re installing six miles of copper piping for the radiant temperature control system that will provide a highly efficient and comfortable working environment.”
Your local Trimble Construction Division dealer |
---|
SITECH Southwest |
SITECH West |
Stantec’s latest work on the UC Davis Health Rancho Cordova Health Administrative Services building builds on the firm’s relationship with the UC system. Stantec is currently providing lead architectural, interiors, buildings engineering, and landscape architecture services for the UC Davis West Village project, the largest student housing development in the U.S., set to complete in advance of the 2021 school year. The global firm is also working with UC San Francisco Health on the Block 34 project, a new ambulatory surgery and multi-specialty outpatient clinic building. This is the third in a series of projects Stantec has helped deliver with UC San Francisco Health over the last decade.
For the Health Administrative Services building, Stantec provided architectural design, interior design, civil, landscape design, lighting, acoustics, and supported mechanical and plumbing, electrical, and sustainability services on the project. The UC Health Administrative Services building is expected to be completed in April 2022.