SACRAMENTO, CA — SmithGroup celebrates the groundbreaking of the new Kaiser Permanente Railyards Medical Center at the Sacramento Railyards in Sacramento, California.
The new hospital will be situated on an 18-acre site in the heart of downtown Sacramento at The Railyards. The Railyards is one of the nation’s largest infill projects, transforming 244 acres of historically significant land into a mixed-use urban community offering residential, retail, office, cultural, and entertainment amenities, parks, and a transportation hub.
The Kaiser Permanente Railyards Medical Center is pioneering sustainable hospital design, representing one of the health care provider’s first two all-electric hospitals. It is projected to be one of the first all-electric hospitals in California when completed.
The health care complex will include:
- A hospital building spanning 662,000 square feet, rising eight stories high
- A five-story hospital support building with 173,000 square feet of space
- A two-story central utility plant covering 32,000 square feet
- A seven-story parking garage with 1,500 stalls
Your local Trimble Construction Division dealer |
---|
SITECH West |
SITECH Southwest |
The hospital will offer a wide range of services, including:
- 310 beds, with a 48-bed intensive care unit
- A 38-bed birthing center and an eight-bed neonatal intensive care unit
- 14 operating rooms and 70 emergency treatment bays