California Builder & Engineer

Dedicated to the people who make our built environment better and safer. We tell your stories and celebrate your successes.

Register with us and receive industry news and content only available to subscribers.

Subscribe
Contacts

Indianapolis, IN, USA (HQ)

903 E. Ohio St., Indianapolis, IN 46202

Call: (317) 423-2325

info@acppubs.com
January 2026

Turner Breaks Ground on Bakar Labs for Energy + Materials at UC Berkeley

BERKELEY, CA — Turner Construction Company joined representatives from Bakar Labs, University of California-Berkeley, Gensler, and A Squared Solutions to celebrate the groundbreaking of Bakar Labs for Energy + Materials, a new 146,000-square-foot facility that will provide laboratory and collaboration space for innovative companies advancing energy and material technologies.

The five-story building is designed by Gensler to foster flexibility and adaptability, allowing for future reconfiguration of laboratories, offices, and shared research environments. The facility will feature advanced laboratories, 3D printing studios, meeting and conference rooms, and offices to support the growth of early-stage companies and research initiatives.

“Turner is honored to partner with everyone on the Bakar Labs for Energy + Materials project," said Manu Garg, Project Executive, Turner Construction Company. “This collaboration reflects our shared commitment to excellence and innovation in delivering complex research facilities. We look forward to contributing our expertise to a project that exemplifies the power of collaboration in advancing research and innovation.”

Turner is providing preconstruction and construction management services for the project. The company’s scope includes excavation, foundation, and structural work, as well as installation of specialized mechanical and electrical systems designed to support advanced research activities.

The project reflects the ongoing relationship between Turner, Gensler, and A Squared Solutions, continuing their collaboration on a range of technically demanding academic and research facilities.

Gomaco
Your local Gomaco dealer
Terry Equipment

Construction is scheduled to continue through 2028, with the building opening shortly thereafter.

Gomaco
Your local Gomaco dealer
Terry Equipment
Gomaco
Your local Gomaco dealer
Terry Equipment
Gomaco
Your local Gomaco dealer
Terry Equipment