New England Construction

Dedicated to the people who make our built environment better and safer. We tell your stories and celebrate your successes.

Register with us and receive industry news and content only available to subscribers.

Subscribe
Contacts

Indianapolis, IN, USA (HQ)

903 E. Ohio St., Indianapolis, IN 46202

Call: (317) 423-2325

info@acppubs.com

New Beverly Middle School Wins CMAA New England Chapter 2019 Project Achievement Award

BOSTON, MA — Beverly Middle School, a project managed by CBRE|Heery, was recently awarded the 2019 CMAA New England Project Achievement Award at the chapter’s annual Project Achievement Award Luncheon. Project team members of CBRE|Heery’s Boston office were joined by representatives from Ai3 Architects and Bacon Agostini (Builder) to accept the award in the Building Project/New Construction – less than $100 Million category.
The new Beverly Middle School is the largest middle school in the Commonwealth of Massachusetts. It is designed to serve over 1,400 students in grades 5-8 in a four-story building totaling 231,000 square feet. The progressive program and building layout are a result of many educational visioning workshops, which included a review of the work of numerous educators and are evidence of how educational programs and environments can be structured to deliver positive educational, social and emotional outcomes. It included a look at past practices and a review of the evolution of education and the way society, economics, education and technology have evolved to influence the modern educational environment.

The workshops resulted in a program that included: breaking down a large school into 12 smaller neighborhoods organized along a centrally-located curved spine; incorporating a hands-on maker/builder space within each neighborhood; integrated small group breakout spaces adjacent to the academic classrooms as well as the neighborhood corridors; distributed dining and common spaces to promote use of the public spaces throughout the entire day; and distributed leadership and professional space for faculty and staff that promotes cross-discipline collaboration amongst educators.

CBRE|Heery served as the owner’s project manager providing a full range of professional construction management services for the $92-million middle school project in Beverly, Massachusetts. The team oversaw the entire project delivery from designer selection, through the study, schematic design and funding phase as well as for the early procurement of the construction manager at Risk Builder, the early package phase, final design and all construction, commissioning and turnover phases.

CBRE|Heery used the construction management at risk delivery method as this would result in completing and opening a new school a year sooner than if the more traditional design-bid-build delivery was used. The new Beverly Middle School welcomed its first students on August 29, 2018.

Volvo CE
Your local Volvo Construction Equipment dealer
Tyler Equipment
Esco Corporation
Your local Esco Corporation dealer
Genalco
Bobcat
Your local Bobcat dealer
Bobcat of Boston