New England Construction

Dedicated to the people who make our built environment better and safer. We tell your stories and celebrate your successes.

Register with us and receive industry news and content only available to subscribers.

Subscribe
Contacts

Indianapolis, IN, USA (HQ)

903 E. Ohio St., Indianapolis, IN 46202

Call: (317) 423-2325

info@acppubs.com

Shawmut Design and Construction Continues Work on Hildreth Elementary School

BOSTON, MA — Shawmut Design and Construction, a national construction management firm, announces details of the Hildreth Elementary School project in Harvard, Massachusetts. Scheduled for completion in spring 2021, the new school will span 85,200 square feet and accommodate 445 students in grades PK-5, creating a modern, 21st century learning environment.

Shawmut, in partnership with Arrowstreet, NV5 and the Massachusetts School Building Authority, broke ground on the new school building this summer. When completed, the space will include 25 core classrooms, a media center, open-styled lobby, cafeteria, gymnasium, art room, superintendent and administrative support staff offices, a STEM center and flexible learning spaces.

“We are honored to be a part of this monumental project for the Town of Harvard,” said Ron Simoneau, Vice President at Shawmut. “By leveraging our vast experience in the education and institutional sectors, our team will deliver a modern learning environment that meets the educational vision of this high-performing school district, while depicting the character and values of the town.”

The Shawmut team will perform all work on the occupied Hildreth Elementary School site in two phases. The first phase of construction includes the ground-up construction of the new school, which will be built adjacent to the existing building, and is designed to enhance overall connectivity and collaborative learning. The core classrooms will include flexible learning spaces, accommodating individual, as well as large and small group learning needs. Shawmut’s team will also create an innovation lab to facilitate STEM learning.

The second phase of construction will begin with the demolition of the existing Hildreth Elementary School building and include outdoor site enhancements. In addition to the development of outdoor play areas, which will include two playgrounds and a sports field, the new site will also feature an updated bus drop-off lane, clearer pick-up/drop-off zones and 96 designated parking spaces. Once completed, the school will include environmentally-focused design elements, such as storm water mitigation measures and rooftop solar panels.

Shawmut’s work on Hildreth Elementary School represents the latest in the firm’s academic portfolio, with recently completed projects including Billerica Memorial High School and Arlington Gibbs School in Massachusetts, Cranston’s Eden Park Elementary in Rhode Island, along with current projects with Noble and Greenough School and Ransom Everglades School.
Volvo CE
Your local Volvo Construction Equipment dealer
Tyler Equipment
Esco Corporation
Your local Esco Corporation dealer
Genalco
Develon
Your local Doosan Infracore Construction Equip dealer
Equipment East