"At Michael Baker, we are proud to be a leader in our industry to provide PDB delivery in a way that ensures highly-collaborative and efficient outcomes for our partners and clients," said Eric Ostfeld, President, Design-Build Services at Michael Baker International. "Alongside our RLW/Clyde JV partners, we look forward to drawing upon our experience and expertise to ensure that quality is built into every step of the project."
"Our team has a long history of partnering with UDOT on innovative projects. Recently, we completed the design for two Bangerter Highway projects — Bangerter Four Interchanges Design-Build (DB) and Bangerter Three Interchanges DB. We are also completing the US-89 PDB project, a reconstruction and widening effort that was the first project in the state to use PDB," said Michael Arens, P.E., Office Executive - Salt Lake City at Michael Baker International. "The Bangerter Highway at 4700 South Project exemplifies our continued efforts to help UDOT keep Utah moving."
The Bangerter Highway at 4700 South Interchange is a grade-separated Single Point Urban Interchange at the existing intersection of Bangerter Highway (SR-154) and 4700 South in West Valley City and Taylorsville, Utah. This project will construct a grade-separated interchange with exit and entrance ramps from Bangerter Highway to 4700 South.