The winning projects in the Rocky Mountain Construction area include:
HDR provided progressive design-build services for an approximately $6-million struvite sequestration system to reduce struvite formation potential, reduce ferric acid and polymer use, and improve the dewaterability of the solids handling process.
Key components of the renovation and restoration project include:
- Damages repaired to improve functions, bringing the building into compliance with current state and federal codes.
- Restoration of the building's historical qualities to their original grandeur.
- Functional renovations to the adjacent Herschler State Office Building. The building received a fully-replaced cladding system and was expanded to accommodate the increased space needs of Wyoming’s state government.
- Expansion and enhancement of The Connector, the below-grade common space joining the two buildings, with revitalized public meeting and hospitality functions to support both buildings.
Other projects receiving Engineering Excellence Awards include:
- Breckenridge North Water Treatment Plant in Colorado - Honor Award
- Siphon 1 Aerial Pipeline Replacement in Colorado - Honor Award
- Boulder Foothills Underpass in Colorado - Merit Award
| Your local Trimble Construction Division dealer |
|---|
| SITECH Rocky Mountain |
| SITECH Southwest |
| SITECH Southwest |
| SITECH Northwest |
| SITECH Northwest |
| SITECH Rocky Mountain |















































