“Positioned at Miller and Curry Roads, Banyan North Tempe is an Opportunity Zone project located in a very active development corridor,” said Jim Kurtzman, Senior Vice President at McShane. “Tenants will not only have a beautiful, amenity-filled development to call home, they will also have easy access to downtown Tempe, Phoenix, and Sky Harbor International Airport.”
The 11.12-acre site will also incorporate 8,000 square feet of amenity space with elaborate wood work including a commercial-grade fitness center, live-work units, an outdoor pool and spa, fire pits, barbeques, and a dog park overlooking downtown Tempe. Additionally, there will be parking for 510 vehicles.
Each unit will contain finishes including LVT and carpet flooring, smooth-finish drywall, quartz countertops, and frameless glass shower enclosures. The buildings will feature wood frame construction with a façade of stucco, thin brick, and wood-look metal lattice.
McShane worked closely with the owners, architect, civil, and geotechnical engineers during the pre-construction phase to determine best practices and provide improved constructability methods. The team participated in early and frequent estimate and value engineering cycles to ensure the project achieved budgetary goals while maintaining quality and finish standards during a time of volatile material costs.
Completion of Banyan North Tempe is expected in April 2023. The architect of record is Todd & Associates.
Your local Gomaco dealer |
---|
Faris Machinery |
Tri-State Truck & Equipment Inc |
McShane Construction Company was established in 1984 and is headquartered in Rosemont, Illinois, with regional offices in Phoenix, Arizona; Auburn, Alabama; Irvine, California; and Madison, Wisconsin. The firm offers integrated design/build and build-to-suit construction services for the multi-family, retail, office, recreational, hospitality, educational, health care, distribution, manufacturing, and food processing markets.