- Access to work areas: The work areas include both land and marine (Fox River/canal system) construction access. Marine access includes barge support equipment for related rehabilitation work in the Fox River and canal system.
- Bypass wastewater: Wastewater will be bypassed around the respective work areas.
- Interceptor lining (CIPP): Traditional CIPP liners will be installed in the remaining concrete interceptor pipes (18-48 inch).
- Structures: Work will include protective coat structure interior surfaces and replacing/modifying structures
The District is requiring all general and 1st tier subcontractors are prequalified as a condition of receiving official bidding documents and submitting a public bid. There are general contractor self-performance requirements.
Telephone inquiries should be directed to Strategic Municipal Services, Inc. Bidders are discouraged from contacting the District.