Western Builder

Dedicated to the people who make our built environment better and safer. We tell your stories and celebrate your successes.

Register with us and receive industry news and content only available to subscribers.

Subscribe
Contacts

Indianapolis, IN, USA (HQ)

903 E. Ohio St., Indianapolis, IN 46202

Call: (317) 423-2325

info@acppubs.com

EPA Announces $569M WIFIA Loan for Flood, Climate Resilience in the Fargo-Moorhead Metropolitan Area

FARGO, ND — The U.S. Environmental Protection Agency (EPA) announces a $569-million Water Infrastructure Finance and Innovation Act (WIFIA) loan for a project to increase climate resilience for communities in the Fargo-Moorhead metropolitan area by reducing flood risks. This project will provide critical health and the environmental protections and create thousands of jobs while EPA’s WIFIA loan will save the community hundreds of millions of dollars.

“This project illustrates that strong partnerships can be forged through investments in water infrastructure,” said EPA Administrator Michael S. Regan. “Through water infrastructure, we can address local challenges while creating good paying jobs. Programs like WIFIA and the State Revolving Funds have a track record of success and could be scaled up to benefit more communities under President Biden’s American Jobs Plan.”

The Fargo-Moorhead Metropolitan Area Stormwater Diversion Channel Project includes two components to manage uncontrolled stormwater that can affect the metro area. The stormwater diversion channel component includes the construction of a 30-mile channel to re-direct and temporarily store surplus stormwater flows safely away from the metropolitan area. The in-town levee project includes modifications to 13 levees and 27 stormwater lift stations in the Cities of Fargo, North Dakota, and Moorhead, Minnesota. By managing the flow of spring snow melt and summer stormwater, the project will protect 245,000 residents from flooding risks.

The Metro Flood Diversion Authority employed an innovative procurement approach to advance this project by utilizing a public-private partnership (P3) model. WIFIA’s flexible loan repayment features were key in facilitating the P3 structure. This project will cost $1.3 billion, and EPA’s WIFIA loan will finance nearly half of that figure. The remaining project costs will be funded by a combination of an $81-million North Dakota Clean Water State Revolving Fund loan and over $650 million in private financing. Project construction and operation are expected to create an estimated 4,000 jobs.

SITECH
Your local Trimble Construction Division dealer
SITECH Northwest
LBX Link Belt Excavators
Your local Link Belt dealer
Hayden-Murphy Equipment Co