Western Builder

Dedicated to the people who make our built environment better and safer. We tell your stories and celebrate your successes.

Register with us and receive industry news and content only available to subscribers.

Subscribe
Contacts

Indianapolis, IN, USA (HQ)

903 E. Ohio St., Indianapolis, IN 46202

Call: (317) 423-2325

info@acppubs.com

General John W. Vessey Readiness Center Receives LEED Gold Certification

ARDEN HILLS, MN — The General John W. Vessey Readiness Center in Arden Hills, Minnesota, has been awarded LEED Gold certification. The U.S. Green Building Council’s LEED green building program is the preeminent program for the design, construction, maintenance, and operations of high-performance green buildings.

LEO A DALY provided architectural design and mechanical, electrical, and structural engineering for the 500,000-square-foot facility, which is the new headquarters of the Minnesota Army National Guard 34th Red Bull Infantry Division. Damon Farber provided landscape architecture.

One of the most storied divisions in National Guard history, the Red Bulls have served their local communities for more than 100 years in response to fire, flood, search, and rescue activities, in addition to participating in warfighting efforts when called.

“This project exemplifies, in a very tangible way, LEO A DALY’s commitment to innovative design that is rooted in social and ecological responsibility,” Chief Sustainability Officer Ellen Mitchell-Kozack, AIA, LEED BD+C, WELL AP, SEED, said. “Our integrated design process helped us to make design decisions that improved the building and site, made sense for the owner, and reduced carbon emissions.”

Restoring Ecological Balance
This project is part of a continuing effort to rehabilitate the site’s rural Minnesota ecosystem after decades of contamination. Formerly the location of the Twin Cities Army Ammunition Plant, the site was used during World War II, the Korean War, and Vietnam conflict to manufacture more than 16.5 billion rounds of small-arms ammunition. It was named a Superfund site in 1983, and in the years since has been the target of extensive environmental investigation and remediation.

LEO A DALY’s design contributes to these efforts through a master-planning, landscape, and architectural approach aimed at protecting biodiversity, improving local waterways, and minimizing greenhouse gas emissions.

LBX Link Belt Excavators
Your local Link Belt dealer
Hayden-Murphy Equipment Co

With the aid of a National Guard environmental expert, the facility and site features were organized around the habitats and nesting patterns of protected bird species and the Blanding’s turtle, an endangered species. The existing drainage patterns, wetlands, and arrangement of mature forest growth guided the positioning of the building, parking lots, and landscaping. Native plantings surround the facility, mitigating the need for irrigation and maintenance with fuel-powered equipment. Impervious surfaces are offset through natural, onsite infiltration and treatment strategies.

Passive and Active Carbon Reduction
The project minimizes its carbon footprint through an efficient design and renewable energy strategies, which reduce the building’s Energy Use Intensity 87 percent from baseline. The building uses geothermal heat pumps, photovoltaic arrays, and energy-efficient systems, including demand control ventilation, to maximize efficiency.

26,000 square feet of the space is served by an underfloor air distribution system to improve ventilation effectiveness, allowing for reduction of air-conditioning-related energy use. This system was partitioned underfloor to create zones for spaces used regularly and those used only on drill weekends. All DOAS units serving heat pumps and the VAV air handler serving the underfloor space are connected to a geothermal heat pump loop consisting of 240 wells, each 150 feet deep.

LED lights are used throughout the building, with occupancy and daylighting controls to minimize energy usage. Tubular skylights dappling the roof of the office wing fill the workplace with natural light. On a typical day, no artificial light is needed.

As construction contractor for the project, Minneapolis-based Stahl Construction played a key role throughout the certification process.

Volvo CE
Your local Volvo Construction Equipment dealer
Nuss Truck & Equipment
Volvo CE
Your local Volvo Construction Equipment dealer
Nuss Truck & Equipment