Western Builder

Dedicated to the people who make our built environment better and safer. We tell your stories and celebrate your successes.

Register with us and receive industry news and content only available to subscribers.

Subscribe
Contacts

Indianapolis, IN, USA (HQ)

903 E. Ohio St., Indianapolis, IN 46202

Call: (317) 423-2325

info@acppubs.com
July 2026

Hampton Roads Bridge-Tunnel Expansion Will Add Capacity to One of Virginia’s Busiest Corridors

by: Larry Bernstein
The Hampton Roads Bridge-Tunnel connects two man-made islands between Hampton and Norfolk, Virginia.
The Hampton Roads Bridge-Tunnel connects two man-made islands between Hampton and Norfolk, Virginia.

At the time of its opening in November 1957, the 3.5-mile-long Hampton Roads Bridge-Tunnel (HRBT) was the world's first, and then-longest, immersed tube tunnel to connect two man-made islands. Nineteen years later in 1976, a parallel immersed tube was added. In September 2025, the Virginia Department of Transportation (VDOT) made history again, with the final breakthrough of twin bored tunnels.

Currently undergoing expansion, the HRBT connects Hampton and Norfolk, Virginia. The construction team, under VDOT, is led by a joint venture comprising FlatironDragados USA, Vinci Construction, and Dodin Campenon Bernard.

Meeting Growing Demand

Approximately 100,000 vehicles a day currently move through the corridor, well in excess of the 70,000 vehicles it was designed to support.

The corridor is a critical pathway for commerce from the Port of Virginia, one of the largest East Coast ports, as well as for major stakeholders including several colleges and universities, maritime businesses, and health care providers. It is a popular gateway to robust tourism in the region.

Another major stakeholder is the Navy. The United States Fleet Forces Command is based at Naval Station Norfolk, the largest naval base in the world.

“The proximity to the naval base has led to a thriving shipbuilding and repair industry in the area,” said Michael Davis, VDOT District Engineer and Senior Lead.

Traffic demands have necessitated expanding the project for decades. Davis, who grew up in the area, recalls backups dating back years that began as early as 3:30 p.m. most afternoons.

The combination of increased vehicular traffic demand throughout the corridor and ship traffic passing over the tunnel drove the need for the additional tunnels.

The Hampton Roads Bridge-Tunnel is part of the I-64 corridor between Norfolk and Hampton. The expansion of the HRBT goes beyond the tunnel itself and will increase capacity along the entire 10-mile project corridor.

The scope includes the following: